Browse
Search
2021-482-E-AMS-Sasser Companies-Emergency Services 510 meadlowlands drive warehouse remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-482-E-AMS-Sasser Companies-Emergency Services 510 meadlowlands drive warehouse remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 2:27:19 PM
Creation date
9/7/2021 2:25:32 PM
Metadata
Fields
Template:
Contract
Date
8/27/2021
Contract Starting Date
8/27/2021
Contract Ending Date
8/31/2021
Contract Document Type
Agreement
Amount
$190,587.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Environmental Solutions Group ● 7 Maple Leaf Drive., Greensboro, NC 27401 ● 336-373-1538 ● www.Go-ESG.com 11 <br />Report with Protocols for Remediation <br />Environmental Solutions Group <br />Leading people, companies and communities to live, <br />work and prosper in a sustainable environment. <br />A typical PRV includes a visual inspection for dust and mold residue, confirmation that the source of the moisture has <br />been corrected, and air sampling under normal disturbed air conditions to confirm that concentrations of airborne and <br />surface mold spores inside the remediated area of the building envelope meet the following industry guidelines as <br />established by the American Society of Safety Engineers’ Post-Remediation Evaluation Criteria for Mold Contamination <br />(Professional Safety, November 2004). Airborne particle mass (PM10) readings must be below the thresholds established <br />by the EPA for healthy indoor air. <br /> <br />The PRV should be scheduled to occur 24 hours following mold removal and before the remediation firm has pulled <br />equipment out of the building. The remediated area must remain off-limits to any personnel other than the <br />remediation team and testing firm until the PRV has been completed and clearance has been achieved. <br /> <br />The remediation contractor cannot be held responsible for future growth of fungal colonies in the remediated area as <br />new growth can be achieved with the reintroduction of moisture. In addition, a warranty to prevent future mold growth <br />is provided by the manufacturer of chemicals that may have been used during remediation and not the remediation <br />contractor. <br /> <br />The US EPA and OSHA recommend a follow-up inspection be conducted at some time period after the mold remediation <br />has been completed. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: A9A4637A-BE59-4285-99BE-D253C29FA836
The URL can be used to link to this page
Your browser does not support the video tag.