Browse
Search
Agenda - 09-09-2021 Virtual Work Session; Item 1 - Options to Expand Affordable Housing Incentives and Opportunities
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 09-09-2021 Virtual Work Session
>
Agenda - 09-09-2021 Virtual Work Session; Item 1 - Options to Expand Affordable Housing Incentives and Opportunities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2021 7:27:32 PM
Creation date
9/2/2021 7:20:53 PM
Metadata
Fields
Template:
BOCC
Date
9/9/2021
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Agenda for September 9, 2021 Virtual Work Session
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 09-09-2021 Virtual Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Summary of the Residential Review Process <br /> Currently,the Orange County Unified Development Ordinance contains nine different review processes <br /> for residential subdivisions.These vary based on number of lots proposed and designation in the rural or <br /> urban areas of the County.The various process are summarized below. <br /> SubdivisionsExempt <br /> Definition-The combination or recombination of portions of previously subdivided and recorded lots if <br /> the total number of lots is not increased and the resultant lots are equal to or exceed the standards of <br /> the County, including private road justification standards, as detailed within this Ordinance.The division <br /> of land into parcels greater than 10 acres if no street right-of-way dedication is involved.The public <br /> acquisition by purchase of strips of land for widening or opening streets. The division of a tract in single <br /> ownership of the entire area of which is no greater than two acres into not more than three lots, if no <br /> street right-of-way dedication is involved and if the resultant lots are equal to or exceed the standards <br /> of the County as shown by its subdivision regulations. <br /> Review Process <br /> Orange1.Submittal of exempt 2. Staff review and 3. Recordation at <br /> subdivision plat decision > <br /> of Deeds <br /> Review Schedule—One to five days from submittal to recordation. <br /> SubdivisionsExpedited <br /> Definition—A subdivision shall be classified as "expedited"for divisions of a tract or parcel of land in <br /> single ownership meeting all of the following criteria: <br /> 1. The tract or parcel to be divided is not exempt under the provisions of the Ordinance, <br /> 2. No part of the tract or parcel to be divided has been divided within the past 10 years from the <br /> date of application submittal, <br /> 3. The entire area of the tract or parcel to be divided is greater than five acres, <br /> 4. No more than 3 lots result from the division, <br /> 5. All resultant lots comply with the following: <br /> a. Lot dimension and size requirements of applicable land use regulations, <br /> b. The use of the lot(s) is in conformity with applicable zoning requirements, and <br /> c. A permanent means of ingress and egress is recorded for each lot. <br /> Review Process <br /> Staff 1.Submittal of <br /> subdivision3. Recordation at <br /> expedited decision Orange <br /> plat of Deeds <br /> Review Schedule—Five days maximum, as contained in the LIDO. However, in reality,these subdivisions <br /> are experiencing a two to four week review period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.