Browse
Search
2021-476-E-AMS-Dude Solutions-All Facility Assessment Condition Study and Software
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-476-E-AMS-Dude Solutions-All Facility Assessment Condition Study and Software
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 9:02:56 AM
Creation date
9/1/2021 9:01:56 AM
Metadata
Fields
Template:
Contract
Date
8/26/2021
Contract Starting Date
8/26/2021
Contract Ending Date
8/28/2021
Contract Document Type
Contract
Amount
$127,364.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit of Measure N Y Y <br />Quantity N Y Y <br />Unit Cost N Y Y <br />N* <br />Manu/Model/Serial <br />Numbers Y N Will be included on <br />Individual Equipment <br />Record <br />Tag <br />(if available) <br />Y N N <br />Date In Service <br />(if available) <br />Y Y Y <br />Condition Y Y Y <br />Estimated Replacement <br />Cost Y Y Y <br />Estimated Next <br />Replacement Date Y Y Y <br />Life Cycle Y Y Y <br />Included in 20-year Capital <br />Forecast?N Y Y <br />Evaluation <br />At the conclusion of the assessment(s),the DSI Service <br />Provider will prepare reports as described above that include: <br />•A general description of the property and improvements and <br />comment generally on observed conditions. <br />•Comments for components that are exhibiting deferred maintenance issues and provide estimates for <br />"immediate" and "capital repair" costs based on observed conditions, available maintenance history and <br />industry-standard useful life estimates. If applicable, this analysis will include the review of any available <br />documents pertaining to capital improvements completed within the last three years, or currently under <br />contract. The DSI Service Provider shall also inquire about available maintenance records and <br />procedures and interview current available on-site maintenance staff. <br />•A schedule for recommended replacement or repairs (schedule of priorities). <br />12 <br />DocuSign Envelope ID: 4D9EE5C9-1C7C-4BC0-8831-A9615B43A0B9
The URL can be used to link to this page
Your browser does not support the video tag.