Orange County NC Website
The following table defines the standard SOW that will be followed to capture the equipment data used to build <br />the Equipment Inventory, which will be imported into the Work & Asset Management Solution as well as <br />the System-Sub-System data used to build the Capital Reserve Table that will be imported into the capital <br />forecasting or prediction solution. <br />Table Column Header Descriptions <br />Individual or System Level Capture <br />Individual = Item will be collected individually <br />System = Item will be grouped by system or sub-system, location will correspond to the associated <br />building structure <br />Item Represented in Capital Forecasting or Prediction solution? Y/N <br />No = Cost information related to individually captured items will be provided at a system or sub-system <br />level only in capital forecasting or prediction solution <br />Included in Equipment Inventory? Y/N <br />No = Item will not be setup in the work & asset management solution <br />*Items captured as a system will be setup as a single equipment inventory item so that work can be <br />tracked against it. <br />Sub-System <br />Individual <br />or System <br />Level <br />Capture <br />Item Represented <br />in Capital <br />Forecasting? (Y/N) <br />Included in <br />Equipment <br />Inventory? (Y/ <br />N) <br />Comments <br />Exterior Systems <br />Exterior Doors System Level Yes No <br />Exterior Walls <br />(Finish)System Level Yes No <br />Exterior Windows System Level Yes No <br />Roofing System Level Yes No <br />Electrical <br />5 <br />DocuSign Envelope ID: 4D9EE5C9-1C7C-4BC0-8831-A9615B43A0B9