Browse
Search
2021-476-E-AMS-Dude Solutions-All Facility Assessment Condition Study and Software
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-476-E-AMS-Dude Solutions-All Facility Assessment Condition Study and Software
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 9:02:56 AM
Creation date
9/1/2021 9:01:56 AM
Metadata
Fields
Template:
Contract
Date
8/26/2021
Contract Starting Date
8/26/2021
Contract Ending Date
8/28/2021
Contract Document Type
Contract
Amount
$127,364.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Narrative report with descriptions of major systems and corresponding conditions <br />•Primary digital photos of key components and deficiencies are included in the narrative <br />•20-year capital Reserve table with System/Sub-System replacement costs and dates <br />•Import of Systems-level detail into client's DSI capital forecasting/prediction solution <br />•Import major Equipment Items into client's DSI work & asset management solution. <br />Methodology and Approach <br />A Certified DSI Service Provider will collect,document,and analyze the facilities assessment data to achieve <br />the following: <br />•At the start of each building or facility assessment we will interview client's staff to understand what <br />improvements have been made in the last three years, what improvements are planned in the next <br />three years and known problems that may exist. <br />•Inventory all major building equipment including quantity, size, asset tag number, manufacturer, model <br />and serial number. <br />•Identify deficient conditions in terms of deferred maintenance and building condition. <br />•Provide a reasonable cost analysis for the above-mentioned efforts. <br />•For single building projects,provide a report for the property that details the assessment data. <br />•For multi-building projects,data will be collected from every building in the portfolio.The narrative <br />report will include an executive role up for all sites included with the service. <br />The field data collection will be performed at an individual and system level as described below: <br />1.Detailed data collection of individual equipment items will be captured to build an equipment inventory <br />which will be imported into DSI's work & asset management solution as defined in the Asset Inventory <br />and System/Component table below. <br />2.A condition assessment of major building systems, including HVAC, Electrical, Plumbing, Roofing, Site <br />Paving, Vertical Transportation, Structural and Building Envelope to be imported into DSI's capital <br />forecasting/prediction solution as defined in the Asset Inventory and System/Component table below. <br />1.HVAC equipment items only will also be tracked in the capital forecast or prediction solution as specific <br />Sub-Systems.For these items, Make/Model/Serial Number will be captured and tracked in the <br />Equipment Inventory, and the item will also be included as a Sub-System. <br />2.All other major Systems will be collected at the Systems Level in DSI's capital forecasting solution as <br />a general Sub-Systems. <br />Asset Inventory and Systems/Component Table <br />4 <br />DocuSign Envelope ID: 4D9EE5C9-1C7C-4BC0-8831-A9615B43A0B9
The URL can be used to link to this page
Your browser does not support the video tag.