Orange County NC Website
Proposal Form –Sportsplex Main Building Roof Replacement 2 of 4 <br />ALTERNATES: <br />Should any of the alternates as described in the contract documents be accepted, the amount written <br />below shall be the amount to be “added to” or “deducted from” the base bid. (Strike out “Add” or “Deduct” <br />as appropriate.) <br /> <br />GENERAL CONTRACT: <br /> <br />Bid Alternate 01: Prepare, prime, and paint equipment support at the locations shown on the drawings. <br /> <br />(Add)(Deduct) Dollars($)_________________ <br /> <br />Bid Alternate 02: Replace the pipe insulation at the location(s) shown on the drawings. <br /> <br />(Add)(Deduct) Dollars($)_________________ <br /> <br />Bid Alternate 03: Prepare, prime, and paint the natural gas lines on Roof Area A. <br /> <br />(Add)(Deduct) Dollars($)_________________ <br /> <br />UNIT PRICES <br />Estimated quantities for each item below as defined in Section 012100, Paragraph 1.03.A of the Project Manual, shall be <br />considered to have already been included within the base bid amount proposed above. The unit prices provided below shall be <br />applied as appropriate, to compute the total value of changes in the scope of the work in the event that the quantity of actual <br />work performed is more than or less than the estimated quantity. Unit prices quoted and accepted shall apply throughout the <br />life of the contract, except as otherwise specifically noted. Unit prices shall be applied, as appropriate, to compute the total <br />value of changes in the base bid quantity of the work all in accordance with the contract documents. <br /> <br />GENERAL CONTRACT: <br /> <br />No. 1 Metal Deck Restoration (sq.ft.) Unit Price ($) <br /> <br />No. 2 Metal Deck Replacement (sq.ft.) Unit Price ($) <br /> <br />No. 3 Metal Deck Repair (sq. ft.) Unit Price ($) <br /> <br />No. 4 Wood Blocking Replacement (bd.ft.) Unit Price ($) <br /> <br />No. 5 Plywood Replacement (sq.ft.) Unit Price ($)_____________ <br /> <br />No. 6 5/8” Gypsum Board replacement (sq.ft.) Unit Price ($)_____________ <br /> <br />No. 7 Additional Walk Tread Installation (ln. ft.) Unit Price ($) ____________ <br /> <br />No. 8 Rubber Paver (ea.) Unit Price ($) ____________ <br /> <br />No. 9 Tapered Insulation (bd. ft.) Unit Price ($) ____________ <br /> <br />The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in <br />a written order of the designer and shall fully complete all work thereunder within the time specified in the <br />Supplementary General Conditions Article 23. Applicable liquidated damages amount is also stated in the <br />Supplementary General Conditions Article 23. <br /> <br />MINORITY BUSINESS PARTICIPATION REQUIREMENTS <br /> <br />Provide with the bid - Under GS 143-128.2(c) the undersigned bidder shall identify on its bid (Identification of <br />Minority Business Participation Form) the minority businesses that it will use on the project with the total dollar <br />value of the bids that will be performed by the minority businesses. Also list the good faith efforts (Affidavit A) <br />made to solicit minority participation in the bid effort. <br />DocuSign Envelope ID: BFF4747D-7578-438D-BADC-CFCAAE0ECD67