Browse
Search
2020-838-E AMS-Siemens Industries ionization project phase 3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-838-E AMS-Siemens Industries ionization project phase 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 11:51:05 AM
Creation date
8/31/2021 11:49:00 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 07/20 <br /> 1 <br /> [Departmental Use Only] <br /> TITLE Ionization-Phase 3 <br /> FY 2020/2021 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 8th day <br />of December, 2020, by and between Siemens Industry, Inc., (hereinafter called the “Contractor”), and <br />Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Siemens Industry if needed (Sheet dated ) <br /> <br />b. Written specifications prepared by the project engineer. <br /> <br />c. Siemens Industry will provide and install coil mounted O2 Prime Needle Point BiPolar <br />Technology for the Southern Building Unit RTU-1, Whitted Building AHU-1A and AHU- <br />1B. 10 Small Heat Pump Fans mounted in the Justice Facility Building, O2 Prime Needle <br />Point BioPloar Technology to Clerk of Courts Unit and the Uniform Room Unit. The <br />owner will identify the 10 Heat Pumps before construction at the Justice Facility that will <br />have the Ionization installed. proposal dated December 3rd, 2020 which fully describes <br />the work to be performed. Such work will hereafter be called the “Work”. <br />DocuSign Envelope ID: CC55499E-235C-4913-964B-2D4FBDF0D5A1
The URL can be used to link to this page
Your browser does not support the video tag.