Browse
Search
2020-802-E Solid Waste-Triangle Landscape install glass concrete platform
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-802-E Solid Waste-Triangle Landscape install glass concrete platform
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 11:28:09 AM
Creation date
8/31/2021 11:17:33 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AOF53191-262C-4CB2-B674-9AB9C758A904 <br /> 5. Correct other low areas scheduled to remain exposed with a repair topping.Cut out low areas to <br /> ensure a minimum repair topping depth of 1/4 inch to match adjacent floor elevations.Prepare, <br /> mix,and apply repair topping and primer according to manufacturer's written instructions to <br /> produce a smooth,uniform,plane,and level surface. <br /> 6. Repair defective areas,except random cracks and single holes 1 inch or less in diameter,by <br /> cutting out and replacing with fresh concrete.Remove defective areas with clean, square cuts and <br /> expose steel reinforcement with at least a 3/4-inch clearance all around.Dampen concrete <br /> surfaces in contact with patching concrete and apply bonding agent.Mix patching concrete of <br /> same materials and mixture as original concrete except without coarse aggregate.Place,compact, <br /> and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete. <br /> 7. Repair random cracks and single holes 1 inch or less in diameter with patching mortar. Groove <br /> top of cracks and cut out holes to sound concrete and clean off dust,dirt,and loose particles. <br /> Dampen cleaned concrete surfaces and apply bonding agent.Place patching mortar before <br /> bonding agent has dried.Compact patching mortar and finish to match adjacent concrete.Keep <br /> patched area continuously moist for at least 72 hours. <br /> E. Perform structural repairs of concrete,subject to Owner's approval,using epoxy adhesive and patching <br /> mortar. <br /> F. Repair materials and installation not specified above may be used,subject to Owner's approval. <br /> END OF SECTION 03 30 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.