Browse
Search
2020-802-E Solid Waste-Triangle Landscape install glass concrete platform
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-802-E Solid Waste-Triangle Landscape install glass concrete platform
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 11:28:09 AM
Creation date
8/31/2021 11:17:33 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AOF53191-262C-4CB2-B674-9AB9C758A904 <br /> COUNTY OF ORANGE <br /> FINANCIAL SERVICES — PURCHASING <br /> PO BOX 8181 <br /> HILLSBOROUGH, NORTH CAROLINA 27278 <br /> ORANGE COUNTY BID NO. 20200429 <br /> May 22, 2020 <br /> ATTENTION: <br /> [INTERESTED VENDORS <br /> Orange County requests your competitive quotation to furnish the item(s) listed below for Orange <br /> County Solid Waste Glass Recycling Concrete Pad, Solid Waste Glass Recycling Concrete Pad <br /> 1514 Eubanks Road, Chapel Hill, NC. <br /> A site visit is recommended. By submission of a bid the contractor acknowledges he/she fully <br /> understands the extent of the project. <br /> Please send this quotation to the Orange County Purchasing Agent-JovanaAmaro, via email to <br /> amaro(@-orangecountVnc.gov by June 5, 2020 at 2:00 PM <br /> ITEM # COMMODITIES/GOODS OR SERVICES <br /> 1 ORANGE COUNTY SOLID WASTE LANDFILL PROJECT: The scope of work includes <br /> installing a concrete pad for glass recycling. The pad shall be 50' x 22' x 8". Refer to <br /> specifications attached "SECTION 03 30 00—BUILDING CAST-IN-PLACE CONCRETE" <br /> and "SECTION 07 92 00 - JOINT SEALANTS". <br /> The site shall be graded to allow for new pad and existing pad to be flush once new pad <br /> has been installed. See attached pictures for existing soils at the site. The top 12" of soil <br /> are suitable for compaction to meet the specifications. <br /> The new pad and existing pad shall remain two separate pads with expansion material <br /> and joint sealant between the two pads per manufacturer's recommendations. The <br /> existing pad edge shall be cleaned and filled without additional saw-cutting. See section <br /> 07 92 00 -JOINT SEALANTS <br /> The new pad shall be installed using #5 rebar tied 12" centers both directions. <br /> PLEASE STATE FIRM DELIVERY TIME TO START AFTER RECEIPT OF PURCHASE ORDER: <br /> DAYS <br /> PLEASE STATE NUMBER OF DAYS TO COMPLETE THE PROJECT AFTER COMMENCEMENT: <br /> DAYS <br /> Orange County Bid Solid Waste Glass Recycling Concrete Pad Page#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.