Orange County NC Website
DocuSign Envelope ID:OE71AC55-698C-4D9A-B848-92OF1816167B <br /> •r- - k-41 It I I LJ - -L r-,-.-) 3UULneaSt, LLP <br /> Management Services <br /> PROJECT FEES AND SCHEDULE <br /> Project Fees <br /> The estimated fee to perform the proposed tasks is provided on Table 1. Our estimate is based on <br /> experience with similar projects. ECS performs consulting services on a unit rate basis. This estimate <br /> is based on our best estimate of the time required to complete the task. Any additional time and/or <br /> laboratory testing above the costs estimated in Table 1 will be billed in accordance with our standard <br /> unit rates. <br /> Submitted charges for work are based on the number of units of work actually performed. If unusual <br /> conditions are encountered that could affect the performance of the project, we would notify you <br /> immediately, so that appropriate changes could be made to the Scope of Services and the fee <br /> estimate adjusted accordingly, if necessary. It should be noted that meetings and consultation <br /> provided at the request of the client, and beyond the scope of this proposal, will be billed in <br /> accordance with ECS's standard fee schedule. <br /> Table 1 -Total Estimated Fees <br /> No. of <br /> Task/Item Unit Rate Units Fee <br /> Field Work(includes travel time, labor, and Lump Sum 1 $1,000.00 <br /> mileage) <br /> Report and Project Management Lump Sum 1 $550.00 <br /> FILM Sample Analysis, (estimate up to 50 sample $12/sample 50 $600.00 <br /> layers) layer <br /> Total Estimated Fee: $2,150.00 <br /> Project Schedule <br /> The fieldwork will be coordinated th you and II take approximately one day to complete. <br /> Laboratory analysis will take approximately three days to complete. Laboratory turnaround time <br /> begins when samples are received and logged in by the laboratory. The report will be issued within <br /> one week of receipt of the final laboratory report. <br /> If areas of the property cannot be observed due to inaccessibility or unsafe conditions beyond the <br /> control of ECS, ECS will wait until such time either that the area is accessible or the unsafe conditions <br /> are corrected. If ECS must make an additional visit to the site, a change order will be provided for our <br /> additional fees. <br /> If other items are required because of unexpected field conditions encountered in our fieldwork, or <br /> because of a request for additional services, they would be invoiced in accordance with our current <br /> Fee Schedule. Before modifying or expanding our scope of services, you would be informed of our <br /> intentions for both your review and authorization. <br /> Page 4 <br />