Browse
Search
2020-667-E AMS-Lime Energy Services LED lighting retrofit Cafe 113
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-667-E AMS-Lime Energy Services LED lighting retrofit Cafe 113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 3:59:56 PM
Creation date
8/30/2021 3:59:32 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Participation Agreement <br />15. Contributions for Non-Incentivized Work <br />For all eligible customers, this program provides incentives of up to 80% of the cumulative <br />fixed unit price (one-for-one replacement or retro-fit of existing equipment and utilizing the <br />existing electrical wiring and mounting hardware) of measures installed by the installation <br />contractor. Work or services outside of this defined scope should be itemized on the “Non- <br />Incentivized Work Form.” If the implementation contractor discovers any unforeseen <br />additional work outside of the program’s scope, the customer should be informed of this <br />additional work and any associated costs at that time. Should any additional work be <br />required for measure installation, the customer will reserve the right to cancel the work for <br />which additional costs are required. All of the following will be considered additional work <br />and all costs associated with them shall be the responsibility of the customers: All <br />incremental costs for specialty products above the costs of standard equipment; All <br />mounting requirements, wiring needs, and other material and labor costs outside the <br />standard scope of a one-for-one replacement or retrofit of existing equipment, including <br />wiring, material, and labor costs associated with compliance with electrical codes. All <br />incremental costs to comply with Prevailing Wage Laws for additional work needed to <br />complete work at the customer’s premises; All costs for general waste containers <br />delivered to the installation site (if customer cannot provide general waste containers); All <br />aerial lifts; All staging costs; All costs related to delays to measure implementation that <br />are caused by obstructions, immovable objects, or other impediments to reasonable <br />access to all lighting fixtures and equipment being replaced; All costs associated with the <br />additional time needed to stabilize equipment connected to mislabeled circuit panels; If <br />any work is cancelled by the customer because of the customer’s responsibility for non- <br />incentivized work, then all related costs, savings, and incentives proposed for the affected <br />measures will be removed and reflected in the customer’s final invoice. <br /> Proposal Provided By:DEC00044506.50 Page 10 <br />DocuSign Envelope ID: 69370BFA-5538-4B9E-BA17-E7F5AC496936
The URL can be used to link to this page
Your browser does not support the video tag.