Browse
Search
2020-653-E AMS-Sasser Companies ES warehouse remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-653-E AMS-Sasser Companies ES warehouse remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 3:57:48 PM
Creation date
8/30/2021 3:57:30 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phone: (336)449-1144 PO Box 10, Whitsett, NC 27377 Fax: (336)449-1151 <br />www.SASSERCOMPANIES.com <br />Proposal for Phase 2: <br /> <br />➢ Phase 2 will consist of the cleaning, re-boxing if necessary or disposal of all <br />remaining items within the warehouse, cleaning/remediating of the rack system to <br />include boards, structural cleaning of all walls, floors, ceilings and mending the <br />compromises in the insulation wrap. <br />➢ Uniforms, boots, shoes are to be removed from the warehouse and transported <br />back to Sasser Companies for content remediation and temporary storage for up to <br />a month in duration. <br />➢ There will be ten (10) air scrubbers on site for up to four (4) weeks. <br />➢ There will be a generator on site for up to four (4) weeks to supply power to the <br />ten (10) air scrubbers. <br />➢ Fuel for the generator for up to four (4) weeks. <br />➢ Up to ten (10) dehumidifiers will be added to assist in the controlling of the <br />atmospheric conditions within the warehouse and to lower the relative humidity <br />that will be required by the Environmental Solutions Group for the Post <br />Remediation Verification. These will more than likely be running off of house <br />power with the possibility of a pigtail and Sasser Companies would supply the <br />electrician for the necessary service. <br />➢ Four (4) scissor lifts on site for up to four (4) weeks. <br />➢ Temporary toilet and hand washing station. <br />➢ Possible construction of containments, chambers and critical barriers to include <br />zipper doors. <br />➢ Orange County will be responsible for all testing fees incurred by the <br />Environmental Solutions Group. <br />➢ As discussed, Sasser Companies will move items to the secured storage room, the <br />reefer trailer or a county supplied box truck but will not be responsible under this <br />proposed price for the hauling/transporting/delivering/offloading or unpackaging <br />of the items from any of the above listed. <br />➢ Sasser Companies is planning on working this phase of this project between the <br />hours of 830am until no later than 5 pm Monday through Friday. <br />➢ Sasser Companies is planning on working this phase of this project with roughly a <br />six (6) to ten (10) man crew, all of which are trained in mold remediation. (Sasser <br />wants specialized personnel on this project due to the sensitive nature of the items <br />and the importance of completing this project quickly, professionally and <br />proficiently). <br />➢ Sasser Companies will have a Certified Indoor Environmentalist on site for the <br />duration of this project that is able to take particle readings and psychrometric <br />reading and report back to the Environmental Solutions Group if required or <br />needed. <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 19FA71FE-99EC-48DC-9C62-5C1A8BCEF09E
The URL can be used to link to this page
Your browser does not support the video tag.