Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> <br />Revised 12/18 <br /> <br /> <br />If the Contractor, after notice, fails to proceed promptly to comply with the terms of the <br />guarantee, the Owner may have the defects corrected, and the Contractor and the Contractor’s <br />ureties shall be liable for all expenses incurred. "Promptly" is defined as within twenty-four (24) <br />hours for systems necessary to normal operation of the building and within seventy-two (72) <br />hours for all other items. All special guarantees applicable to definite parts of the Work that may <br />be shown in or required by Contract Documents shall be subject to the terms of this paragraph <br />during the first year of the life of such special guarantee. Manufacturer's standard guarantees or <br />warranties which do not comply with the time limit specified herein shall be extended by the <br />Contractor automatically without further action on the part of the Owner or the Designer. <br /> <br />18.4 In the eleventh calendar month after the date of Substantial Completion, and at the request <br />of the Owner, the Contractor, the Owner and the Designer shall make an inspection of the Work <br />for the purpose of identifying defective workmanship and/or materials. If the Contractor, having <br />been requested to do so by the Owner, fails to participate in such inspection, the Contractor <br />shall be conclusively bound by any decision or ruling by the Designer as to any defective <br />workmanship or material and as to the Contractor's responsibility for its repair or replacement. <br /> <br />ARTICLE 19. OWNER'S RIGHT TO DO WORK <br /> <br />19.1 If, during the progress of the Work or during any period of guarantee, the Contractor fails to <br />prosecute the Work properly or to perform any provision of the Contract Documents, the Owner, <br />after three (3) days written notice to the Contractor from the Designer, or from the Owner after <br />Final Payment, may perform or have performed that portion of the Work and may deduct the <br />cost thereof from any amounts due or to become due the Contractor. Notwithstanding any <br />action by the Owner under this paragraph, all warranties and bonds given or to be given by the <br />Contractor shall remain in effect or shall be given by the Contractor. <br /> <br />19.2 Should the cost of such action by the Owner exceed the amount due or to become due the <br />Contractor, the Contractor and his sureties shall be liable for and shall pay to the Owner the <br />amount of such excess. <br /> <br />ARTICLE 20. PARTIAL PAYMENTS <br /> <br />20.1 Within thirty (30) days after his initial receipt of the Construction Contract for signatures, <br />the Contractor shall submit to the Designer a Schedule of Values. The Schedule of Values shall <br />indicate the value of the Work, including applicable overhead and profit, for each Division and <br />section of the Project Specifications. The Designer and Owner shall be provided with the <br />Contractor's estimate papers, Subcontractor agreements, supplier quotes, or other documents <br />substantiating these values if so requested in writing by the Designer. The Contractor shall <br />provide the requested documentation within seven (7) days after receipt of the Designer's <br />written request. The Schedule of Values shall be subject to approval by the Owner, and if the <br />Owner and the Contractor cannot agree upon the Schedule of Values, the Designer shall <br />prepare it, and the Schedule of Values as prepared by the Designer shall be binding on the <br />Owner and the Contractor. No Request for Payment shall be certified by the Designer until the <br />Designer has issued approval of said Schedule of Values. <br /> <br />20.2 Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the <br />Designer a Request for Payment for Work done during the previous calendar month. The <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.