Orange County NC Website
Orange County Skills Development Center Upfit <br />Project No. 2020045 <br />Orange County, NC <br />Pre-Bid Conference Agenda <br />June 23, 2020 at 2:00 p.m. <br />2 <br /> <br /> <br />III Alternates / Allowances: <br /> <br /> ALTERNATES <br />Alternate No. 1; Exterior Egress Walkway: State the amount to be added to the Base Bid for <br />providing all labor and materials to construct the Exterior Egress Walkway as shown and noted in the <br />Contract Drawings per the plans and specifications. <br /> <br />Alternate No. 2; ADA Parking Signage Replacement: State the amount to be added to the Base Bid <br />for providing all labor and materials to construct the ADA Parking Signage improvements as shown and <br />noted in the Contract Drawings per the plans and specifications. <br /> <br />Alternate No. 3; Owner Preferred Manufacturer(s) – Door Hardware: State the amount to be added <br />to the Base Bid for providing all labor and materials indicated and required to accomplish Work involved <br />in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Corbin Russwin Locksets <br /> <br />Alternate No. E-1; Owner Preferred Manufacturer(s) - Electrical: State the amount to be added to <br />the Base Bid for providing all labor and materials indicated and required to accomplish Work involved in <br />providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Connectrac concealed raceway <br /> <br /> <br />________________________________________________________________________________________ <br /> <br />ALLOWANCES <br />(Refer to Division 01 Section 01 21 00 – Allowances for amounts to be included in bid) *** Follow the <br />below numbering when filling out the proposal form. <br /> <br /> Allowance No. A-1; CONTINGENCY: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual <br />cost of subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and <br />profit shall be provided within the contract price. If there is unused allowance at the conclusion of the <br />project, the allowance plus 15% will be deducted from the contract. <br />Contingency: $20,000.00 <br /> <br /> <br /> <br />IV E-Procurement Vendors <br /> If the low bidder is an E-Procurement Vendor, the owner will not be responsible for any fees associated <br />with the E-Procurement process incurred by the low bidder or any subcontractor. Refer to 009010 <br />Special Conditions Article 8 <br /> <br /> <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE