Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />28 4600 - 16 FIRE DETECTION AND ALARM <br />3.04 OWNER PERSONNEL INSTRUCTION <br />A. Provide the following instruction to designated Owner personnel: <br />1. Hands-On Instruction: On-site, using operational system. <br />B. Provide two copies of bound training summary to be referenced by owner's maintenance staff in <br />the future. <br />3.05 CLOSEOUT <br />A. Closeout Demonstration: Demonstrate proper operation of all functions to Owner. <br />1. Be prepared to conduct any of the required tests. <br />2. Have at least one copy of operation and maintenance data, preliminary copy of project <br />record drawings, input/output matrix, and operator instruction chart(s) available during <br />demonstration. <br />3. Have authorized technical representative of control unit manufacturer present during <br />demonstration. <br />4. Demonstration may be combined with inspection and testing required by authority having <br />jurisdiction; notify authority having jurisdiction in time to schedule demonstration. <br />5. Repeat demonstration until successful. <br />B. Occupancy of the project will not occur prior to Project Acceptance. <br />C. Project Acceptance of the project cannot be achieved until inspection and testing is successful <br />and: <br />1. Approved operating and maintenance data has been delivered. <br />2. Spare parts, extra materials, and tools have been delivered. <br />3. All aspects of operation have been demonstrated to Owner. <br />4. Final acceptance of the fire alarm system has been given by authorities having jurisdiction. <br />5. Occupancy permit has been granted. <br />6. Specified pre-closeout instruction is complete. <br />END OF SECTION 28 4600 <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.