Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />28 4600 - 2 FIRE DETECTION AND ALARM <br />12. Certification by either the manufacturer of the control unit or by the manufacturer of each <br />other component that the components are compatible with the control unit. <br />13. Certification by the manufacturer of the control unit that the system design complies with <br />Contract Documents. <br />14. Certification by Contractor that the system design complies with Contract Documents. <br />15. Do not show existing components to be removed. <br />E. Evidence of installer qualifications. <br />F. Evidence of instructor qualifications; training lesson plan outline. <br />G. Inspection and Test Reports: <br />1. Submit inspection and test plan prior to closeout demonstration. <br />2. Submit documentation of satisfactory inspections and tests. <br />3. Submit NFPA 72 "Inspection and Test Form," filled out. <br />H. Operating and Maintenance Data: have one set available during closeout demonstration: <br />1. Original copy of NFPA 72 with portions that are not relevant to this project neatly crossed <br />out by hand; label with project name and date. <br />2. Complete set of specified design documents, as approved by authority having jurisdiction. <br />3. Additional printed set of project record documents and closeout documents, bound or filed <br />in same manuals. <br />4. List of recommended spare parts, tools, and instruments for testing. <br />5. Replacement parts list with current prices, and source of supply. <br />6. Detailed troubleshooting guide and large scale input/output matrix. <br />7. Preventive maintenance, inspection, and testing schedule complying with NFPA 72; <br />provide printed copy and computer format acceptable to Owner. <br />8. Detailed but easy to read explanation of procedures to be taken by non-technical <br />administrative personnel in the event of system trouble, when routine testing is being <br />conducted, for fire drills, and when entering into contracts for remodeling. <br />I. Project Record Documents: Have one set available during closeout demonstration: <br />1. Complete set of floor plans showing actual installed locations of components added or <br />replaced if different from the existing, conduit, and zones. <br />2. "As installed" wiring and schematic diagrams, with final terminal identifications. <br />3. "As programmed" operating sequences, including control events by device, updated <br />input/output chart, and voice messages by event. <br />4. Graphic Chart mounted behind plexiglass and secured to wall at FACP and remote <br />annunciator(s). Graphic char shall indicate all fire alarm devices including the programmed <br />addresses for each device. Frame shall not be removable with standard philips or flat head <br />screw drivers. <br />5. If changes are made to the system components, a copy of the floor plans with device <br />numbers shall be provided in the control panel. Provide a separate sheet for each floor <br />scaled to be on 11 x17 sheets. All devices shall be clearly labeled and a legend provided <br />on the drawings. Indicate locations of cabinets, modules, and end of line devices. Plans <br />shall be bound and sheets laminated. Provide plan holder in panel or in locked box <br />adjacent to panel keyed to match panel. <br />6. If the system is modified, provide CD copy of complete configuration data (site specific <br />programming) for the system submitted to the engineer for distribution to the owner. <br />7. Contractor shall provide the following to the owner <br />a. All software required, both for the installed fire alarm system and personal computer <br />necessary to access the fire alarm system for trouble shooting, programming, <br />modifications, monitoring, de-bugging, or similar functions. <br />b. Complete documentation for all software for both the installed fire alarm system and <br />for any interface PC software necessary for the functions described above. <br />c. Interconnection cable where such is required to connect the fire alarm system to a <br />PC. <br />J. Closeout Documents: <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.