Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />26 0505 - 1 ELECTRICAL DEMOLITION <br />SECTION 26 0505 <br />ELECTRICAL DEMOLITION <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Electrical demolition. <br />PART 2 PRODUCTS <br />2.01 MATERIALS AND EQUIPMENT <br />A.Materials and equipment for patching and extending work. <br />PART 3 EXECUTION <br />3.01 EXAMINATION <br />A.Verify field measurements and circuiting arrangements are as indicated. <br />B.Report discrepancies to Architect before disturbing existing installation. <br />3.02 PREPARATION <br />A.Disconnect electrical systems in walls, floors, and ceilings to be removed. <br />B.Coordinate utility service outages with utility company. <br />C.Provide temporary wiring and connections to maintain existing systems in service during <br />construction. When work must be performed on energized equipment or circuits, use personnel <br />experienced in such operations. <br />D.Existing Electrical Service: Maintain existing system in service until new system is complete <br />and ready for service. Disable system only to make switchovers and connections. Minimize <br />outage duration. <br />1.Obtain permission from Owner at least 48 hours before de-energizing system. <br />E.Fire alarm system shall be maintained to all occupied portions of the building. <br />1.Notify Owner and Fire Marshall a least 48 hours before partially or completely disabling <br />system. <br />2.If the Fire alarm system cannot be maintained in the occupied portion of the building <br />contractor shall provide a fire watch in accordance with NFPA 72 and local authority <br />requirements. <br />3.03 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK <br />A.Remove, relocate, and extend existing installations to accommodate new construction. <br />B.Remove abandoned wiring to source of supply. <br />C.Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling <br />finishes. Where conduit cannot be removed from floors or walls, cut conduit flush with walls <br />and floors, and patch surfaces. <br />D.Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit <br />servicing them is abandoned and removed. Provide blank cover for abandoned outlets that are <br />not removed. <br />E.Repair adjacent construction and finishes damaged during demolition and extension work. <br />F.Maintain access to existing electrical installations that remain active. Modify installation or <br />provide access panel as appropriate. <br />G.Remove all devices from walls or ceilings shown to be removed on the Architectural drawings <br />wether shown on the electrical demolition plans or not. <br />H.Where existing downstream devices are to remain, extend existing branch circuit conduit and <br />conductors to maintain service. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.