Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />23 0593 - 1 TESTING, ADJUSTING, AND <br />BALANCING FOR HVAC <br />SECTION 23 0593 <br />TESTING, ADJUSTING, AND BALANCING FOR HVAC <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Testing, adjustment, and balancing of air systems. <br />B.Commissioning activities. <br />1.02 RELATED REQUIREMENTS <br />A.Section 01 9113 - General Commissioning Requirements: Commissioning requirements that <br />apply to all types of work. <br />B.Section 23 0800 - Commissioning of HVAC. <br />1.03 REFERENCE STANDARDS <br />A.ASHRAE Std 111 - Measurement, Testing, Adjusting, and Balancing of Building HVAC <br />Systems; 2008 (Reaffirmed 2017). <br />1.04 SUBMITTALS <br />A.See Section 01 3000 - Administrative Requirements, for submittal procedures. <br />B.TAB Plan: Submit a written plan indicating the testing, adjusting, and balancing standard to be <br />followed and the specific approach for each system and component. <br />1.Include at least the following in the plan: <br />a.List of all air flow, water flow, sound level, system capacity and efficiency <br />measurements to be performed and a description of specific test procedures, <br />parameters, formulas to be used. <br />b.Copy of field checkout sheets and logs to be used, listing each piece of equipment to <br />be tested, adjusted and balanced with the data cells to be gathered for each. <br />c.Discussion of what notations and markings will be made on the duct and piping <br />drawings during the process. <br />d.Final test report forms to be used. <br />e.Procedures for formal deficiency reports, including scope, frequency and distribution. <br />C.Final Report: Indicate deficiencies in systems that would prevent proper testing, adjusting, and <br />balancing of systems and equipment to achieve specified performance. <br />1.Revise TAB plan to reflect actual procedures and submit as part of final report. <br />2.Submit draft copies of report for review prior to final acceptance of Project. Provide final <br />copies for Architect and for inclusion in operating and maintenance manuals. <br />3.Include actual instrument list, with manufacturer name, serial number, and date of <br />calibration. <br />4.Form of Test Reports: Where the TAB standard being followed recommends a report <br />format use that; otherwise, follow ASHRAE Std 111. <br />5.Units of Measure: Report data in both I-P (inch-pound) and SI (metric) units. <br />PART 2 PRODUCTS - NOT USED <br />PART 3 EXECUTION <br />3.01 GENERAL REQUIREMENTS <br />A.Perform total system balance in accordance with one of the following: <br />B.Begin work after completion of systems to be tested, adjusted, or balanced and complete work <br />prior to Substantial Completion of the project. <br />C.TAB Agency Qualifications: <br />1.Company specializing in the testing, adjusting, and balancing of systems specified in this <br />section. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.