Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />22 1315 - 2 SANITARY WASTE (CAST IRON) <br />the entire system the piping shall be smoke tested using smoke bombs. The contractor shall plug <br />waste line where it exits building, fill all of the traps with water and test the waste and vent piping <br />by using a smoke bomb in a wall or floor cleanout. He shall install a plug on the cleanout once <br />the smoke bomb has been dropped into the cleanout. The smoke bomb test shall be held for <br />thirty minutes without evidence of leakage in the piping. The smoke bombs for this testing shall <br />be furnished by the contractor. Once the testing of the piping has been completed, the <br />contractor shall flush all of the smoke bombs from the waste piping system. <br />H.All piping and equipment installed under this Contract shall be tested in the presence of the <br />Engineer and the proper Plumbing Inspector, and proved tight for the periods stated above, or <br />longer if required by the Inspector. <br />I.The test shall be administered in sections if deemed advisable. <br />J.No plumbing system or part thereof shall be covered or concealed until after it has been tested <br />and approved. <br />K.If such work has been covered or concealed before testing, it shall be exposed for testing. <br />END OF SECTION 22 1315 <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.