Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />22 0100 - 6 PLUMBING GENERAL PROVISIONS <br />SUBSTITUTIONS AND PRODUCT OPTIONS: <br />MANUFACTURER OR REPRESENTATIVE CONTRACTOR OR BIDDER <br />SUBMITTED BY:SUBMITTED BY: <br />NAME: __________________________ NAME:________________________________ <br />FIRM: ___________________________FIRM:________________________________ <br />ADDRESS:_______________________ ADDRESS:________________________________ <br />_________________________________________________________________ <br />_________________________________________________________________ <br />PHONE NO.:______________________PHONE NO.:_______________________________ <br />DATE: ___________________________DATE:________________________________ <br />SIGNATURE:______________________SIGNATURE:_______________________________ <br />By approving and submitting shop drawings, product data and samples, the Contractor <br />represents that he has determined and verified all materials, field measurements, and field <br />construction criteria related hereto, or will do so, and that he has checked and coordinated the <br />information contained within such submittals with the requirements of the work and of the <br />Contract Documents. <br />The Contractor shall not be relieved of responsibility for any deviation from the requirements of <br />the Contract Documents by the Architect/Engineer's approval of shop drawings, product data or <br />samples unless the Contractor has specifically informed the Architect/Engineer in writing of <br />such deviation at the time of submission and the Architect/Engineer has given written approval <br />to the specific deviation. The Contractor shall not be relieved from responsibility for errors or <br />omissions in the shop drawings, product data or samples by the Architect's approval. <br />ARCHITECT'S REPLY:ENGINEER'S REPLY: <br />( ) APPROVED ( ) APPROVED <br />( ) APPROVED AS CORRECTED ( ) APPROVED AS CORRECTED <br />( ) REVISE AND RESUBMIT ( ) REVISE AND RESUBMIT <br />( ) NOT APPROVED ( ) NOT APPROVED <br />ARCHITECT:ENGINEER: <br />____________________________________ PDC <br />BY: ________________________________BY:_____________________________ <br />SIGNATURE:_________________________ SIGNATURE:_____________________ <br />DATE: ______________________________DATE:___________________________ <br />END OF SECTION 22 0100 <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.