Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />22 0100 - 2 PLUMBING GENERAL PROVISIONS <br />6.Has included a list of similar projects on which this product has been used with names and <br />telephone numbers for verification. <br />7.Has written verification from the product manufacturer that this product has been in use a <br />minimum of two (2) years on a project similar to this work. <br />8.Substitutions will not be considered when they are indicated or implied on shop drawing or <br />product data submittals, without separate written request, or when acceptance will require <br />revision to the Contract Documents. <br />C.Architect/Engineer Review <br />1.Review and approval will rely on manufacturer's literature and other data as outlined <br />herein. <br />2.Inadequacies in such submittals that fail to identify unsuitability are the responsibility of the <br />parties making submittal. <br />D.Substitution Procedure <br />1.Submit written request for substitution for consideration. Limit each request to one <br />proposed substitution. <br />2.Submit shop drawings, product data, and certified test results attesting to the proposed <br />product equivalence. <br />3.Submit listing of similar projects. <br />4.Submit manufacturer's written verification that product has been in use a minimum of two <br />(2) years at similar projects. <br />5.The Architect/Engineer will notify Contractor, in writing, of decision to accept or reject <br />request. <br />6.Products bid or incorporated in the work that are not specified and without written approval <br />of the Architect/Engineer may not be acceptable, and if not, the Contractor will be required <br />to furnish and install the products specified. <br />7.The Architect/Engineer will issue written approvals of product substitutions to all Bidders. <br />Substitutions are not approved without written approval. <br />E.Forms: Copy forms incorporated at the end of this section and use for all product substitution <br />requests. <br />1.04 SUBMITTALS <br />A.See General and Supplementary General Conditions. <br />B.Within ten days after notification of the award of the Contract and written notice to begin work, <br />the Contractor shall submit to the Architect/Engineer for approval a detailed list of equipment <br />and material that he proposes to use. Items requiring submittal data for approval will be noted <br />at this time. <br />C.The Contractor shall provide an electronic pdf copy of the submittal data on the products, <br />methods, etc. proposed for use on the project. The submittal shall contain complete submittal <br />data on all products, methods, etc. proposed for use on the project. <br />D.Each submittal shall bear the approval of the Contractor indicating that he has reviewed the <br />data and found it to meet the requirements of the specifications as well as space limitations and <br />other project conditions. The submittals shall be clearly identified showing project name, <br />manufacturer's catalog numbers, and all necessary performance and fabrication data. <br />E.The Contractor shall submit to the Engineer a set of accurately marked-up plans indicating all <br />changes encountered during the construction. Final payment will be contingent upon receipt of <br />these as-built plans. <br />F.The Contractor shall furnish an electronic copy of maintenance and operating instructions as <br />outlined in Paragraph C, Execution, Item #7, of this specification section. <br />G.The Contractor shall submit to the Owner all certificates required for operating the system in <br />compliance with the plans and specifications. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.