Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />21 1000 - 14 WATER-BASED <br />FIRE-SUPPRESSION SYSTEMS <br />5.Special Applications: Quick-response sprinklers in all areas. <br />6.Sprinkler Finishes: <br />a.Upright, Pendent, and Sidewall Sprinklers: Chrome plated in finished spaces <br />exposed to view; rough bronze in unfinished spaces not exposed to view; wax coated <br />where exposed to acids, chemicals, or other corrosive fumes. <br />b.Recessed Sprinklers: Bright chrome, with bright chrome threaded escutcheon. <br />3.09 SPRINKLER INSTALLATION <br />A.Install sprinklers in suspended ceilings in center of acoustical ceiling panels and tiles. <br />B.Do not install pendent or sidewall, wet-type sprinklers in areas subject to freezing. Use dry-type <br />sprinklers with water supply from heated space. <br />3.10 CONNECTIONS <br />A.Drawings indicate general arrangement of piping, fittings, and specialties. <br />B.Install piping adjacent to equipment to allow service and maintenance. <br />C.Connect piping to specialty valves, hose valves, specialties, and accessories. <br />1.Sprinkler system, hydraulically. <br />2.Pressure gages and controls, hydraulically. <br />3.Electrical power system. <br />4.Fire alarm. <br />D.Connect compressed-air supply to dry-pipe sprinkler piping. <br />E.Connect air compressor to the following piping and wiring: <br />1.Pressure gages and controls. <br />2.Electrical power system. <br />3.Fire alarm devices, including low-pressure alarm. <br />F.Electrical Connections: Power wiring is specified in Division 26. <br />G.Connect alarm devices to fire alarm. <br />H.Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical <br />Systems." <br />I.Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and <br />Cables." <br />J.Tighten electrical connectors and terminals according to manufacturer's published <br />torque-tightening values. If manufacturer's torque values are not indicated, use those specified <br />in UL 486A and UL 486B. <br />3.11 LABELING AND IDENTIFICATION <br />A.Paint and or install labeling and pipe markers on equipment and piping according to owners <br />requirements. <br />3.12 FIELD QUALITY CONTROL <br />A.Perform the following field tests and inspections and prepare test reports: <br />1.Leak Test: After installation, charge system and test for leaks. Repair leaks and retest <br />until no leaks exist. <br />2.Test and adjust controls and safeties. Replace damaged and malfunctioning controls and <br />equipment. <br />3.Energize circuits to electrical equipment and devices. <br />4.Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance" <br />Chapter. <br />5.Coordinate with fire alarm tests. Operate as required. <br />6.Verify that equipment hose threads are same as local fire department equipment. <br />B.Report test results promptly and in writing to Architect and authorities having jurisdiction. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.