Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />21 1000 - 3 WATER-BASED <br />FIRE-SUPPRESSION SYSTEMS <br />G.Field quality-control test reports. <br />H.Operation and Maintenance Data: For standpipe and sprinkler specialties to include in <br />emergency, operation, and maintenance manuals. <br />1.07 QUALITY ASSURANCE <br />A.Installer Qualifications: <br />1.Installer's responsibilities include designing, fabricating, and installing fire-suppression <br />systems and providing professional engineering services needed to assume engineering <br />responsibility. Base calculations on results of fire-hydrant flow test. <br />a.Engineering Responsibility: Preparation of working plans, calculations, and field test <br />reports by a qualified professional engineer. <br />B.Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel <br />Code: Section IX. <br />C.NFPA Standards: Fire-suppression-system equipment, specialties, accessories, installation, <br />and testing shall comply with the following: <br />1.NFPA 13, "Installation of Sprinkler Systems." <br />1.08 COORDINATION <br />A.Coordinate layout and installation of sprinklers with other construction that penetrates ceilings, <br />including light fixtures, HVAC equipment, and partition assemblies. <br />1.09 EXTRA MATERIALS <br />A.Furnish extra materials described below that match products installed and that are packaged <br />with protective covering for storage and identified with labels describing contents. <br />1.Sprinkler Cabinets: Finished, wall-mounting, steel cabinet with hinged cover, with space <br />for minimum of six spare sprinklers plus sprinkler wrench. Include number of sprinklers <br />required by NFPA 13 and sprinkler wrench. Include separate cabinet with sprinklers and <br />wrench for each type of sprinkler on Project. <br />PART 2 PRODUCTS <br />2.01 MANUFACTURERS <br />A.In other Part 2 articles where titles below introduce lists, the following requirements apply to <br />product selection: <br />1.Available Manufacturers: Subject to compliance with requirements, manufacturers offering <br />products that may be incorporated into the Work include, but are not limited to, <br />manufacturers specified. <br />2.Manufacturers: Subject to compliance with requirements, provide products by one of the <br />manufacturers specified. <br />2.02 STEEL PIPE AND FITTINGS <br />A.Refer to Section 3.4 for sprinkler system pipe application. <br />B.Threaded-End, Standard-Weight Schedule 40 Steel Pipe: ASTM A 53/A 53M, ASTM A 135, or <br />ASTM A 795, hot-dip galvanized where indicated and with factory- or field-formed threaded <br />ends. <br />1.Cast-Iron Threaded Flanges: ASME B16.1. <br />2.Malleable-Iron Threaded Fittings: ASME B16.3. <br />3.Gray-Iron Threaded Fittings: ASME B16.4. <br />4.Steel Threaded Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M or ASTM A 106, <br />Schedule 40, seamless steel pipe hot-dip galvanized where indicated. Include ends <br />matching joining method. <br />5.Steel Threaded Couplings: ASTM A 865 hot-dip galvanized-steel pipe where indicated. <br />C.Grooved-End, Standard-Weight Schedule 40 Steel Pipe: ASTM A 53/A 53M, ASTM A 135, or <br />ASTM A 795, hot-dip galvanized where indicated and with factory- or field-formed, roll-grooved <br />ends. <br />1.Grooved-Joint Piping Systems: <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.