Orange County NC Website
Construction Documents <br />20033 <br />Orange County Europa Center <br />21 0500.01 - 7 COMMON WORK RESULTS FOR <br />FIRE SUPPRESSION <br />1.Painting of fire-suppression systems, equipment, and components is specified in Division <br />09 Sections "Interior Painting" and "Exterior Painting." <br />2.Damage and Touchup: Repair marred and damaged factory-painted finishes with <br />materials and procedures to match original factory finish. <br />F.CONCRETE BASES <br />1.Concrete Bases: Anchor equipment to concrete base according to equipment <br />manufacturer's written instructions and according to seismic codes at Project. <br />a.Construct concrete bases of dimensions indicated, but not less than 4 inches (100 <br />mm) larger in both directions than supported unit. <br />b.Install dowel rods to connect concrete base to concrete floor. Unless otherwise <br />indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of <br />the base. <br />c.Install epoxy-coated anchor bolts for supported equipment that extend through <br />concrete base, and anchor into structural concrete floor. <br />d.Place and secure anchorage devices. Use supported equipment manufacturer's <br />setting drawings, templates, diagrams, instructions, and directions furnished with <br />items to be embedded. <br />e.Install anchor bolts to elevations required for proper attachment to supported <br />equipment. <br />f.Install anchor bolts according to anchor-bolt manufacturer's written instructions. <br />g.Use 3000-psi (20.7-MPa), 28-day compressive-strength concrete and reinforcement <br />as specified in Division 03 Section "Cast-in-Place Concrete - Miscellaneous <br />Cast-in-Place Concrete]." <br />G.ERECTION OF METAL SUPPORTS AND ANCHORAGES <br />1.Refer to Division 05 Section "Metal Fabrications" for structural steel. <br />2.Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and <br />elevation to support and anchor fire-suppression materials and equipment. <br />3.Field Welding: Comply with AWS D1.1. <br />H.ERECTION OF WOOD SUPPORTS AND ANCHORAGES <br />1.Cut, fit, and place wood grounds, nailers, blocking, and anchorages to support, and anchor <br />fire-suppression materials and equipment. <br />2.Select fastener sizes that will not penetrate members if opposite side will be exposed to <br />view or will receive finish materials. Tighten connections between members. Install <br />fasteners without splitting wood members. <br />3.Attach to substrates as required to support applied loads. <br />I.GROUTING <br />1.Mix and install grout for fire-suppression equipment base bearing surfaces, pump and <br />other equipment base plates, and anchors. <br />2.Clean surfaces that will come into contact with grout. <br />3.Provide forms as required for placement of grout. <br />4.Avoid air entrapment during placement of grout. <br />5.Place grout, completely filling equipment bases. <br />6.Place grout on concrete bases and provide smooth bearing surface for equipment. <br />7.Place grout around anchors. <br />8.Cure placed grout. <br />END OF SECTION 21 0500.01 <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE