Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20033 <br />Orange County Europa Center <br />21 0500.01 - 6 COMMON WORK RESULTS FOR <br />FIRE SUPPRESSION <br />17.Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and <br />mechanical sleeve seals. Select sleeve size to allow for 1-inch (25-mm) annular clear <br />space between pipe and sleeve for installing mechanical sleeve seals. <br />a.Install steel pipe for sleeves smaller than 6 inches (150 mm) in diameter. <br />b.Install cast-iron "wall pipes" for sleeves 6 inches (150 mm) and larger in diameter. <br />c.Mechanical Sleeve Seal Installation: Select type and number of sealing elements <br />required for pipe material and size. Position pipe in center of sleeve. Assemble <br />mechanical sleeve seals and install in annular space between pipe and sleeve. <br />Tighten bolts against pressure plates that cause sealing elements to expand and <br />make watertight seal. <br />18.Underground, Exterior-Wall Pipe Penetrations: Install cast-iron "wall pipes" for sleeves. <br />Seal pipe penetrations using mechanical sleeve seals. Select sleeve size to allow for <br />1-inch (25-mm) annular clear space between pipe and sleeve for installing mechanical <br />sleeve seals. <br />a.Mechanical Sleeve Seal Installation: Select type and number of sealing elements <br />required for pipe material and size. Position pipe in center of sleeve. Assemble <br />mechanical sleeve seals and install in annular space between pipe and sleeve. <br />Tighten bolts against pressure plates that cause sealing elements to expand and <br />make watertight seal. <br />19.Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and <br />floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to <br />Division 07 Section "Penetration Firestopping" for materials. <br />20.Verify final equipment locations for roughing-in. <br />21.Refer to equipment specifications in other Sections of these Specifications for roughing-in <br />requirements. <br />D.PIPING JOINT CONSTRUCTION <br />1.Join pipe and fittings according to the following requirements and Division 21 Sections <br />specifying piping systems. <br />2.Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe. <br />3.Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before <br />assembly. <br />4.Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to <br />tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," <br />using lead-free solder alloy complying with ASTM B 32. <br />5.Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" <br />Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8. <br />6.Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut <br />threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and <br />restore full ID. Join pipe fittings and valves as follows: <br />a.Apply appropriate tape or thread compound to external pipe threads unless dry seal <br />threading is specified. <br />b.Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or <br />damaged. Do not use pipe sections that have cracked or open welds. <br />7.Welded Joints: Construct joints according to AWS D10.12, using qualified processes and <br />welding operators according to Part 1 "Quality Assurance" Article. <br />8.Flanged Joints: Select appropriate gasket material, size, type, and thickness for service <br />application. Install gasket concentrically positioned. Use suitable lubricants on bolt <br />threads. <br />9.Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and <br />fittings according to the following: <br />a.Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent <br />cements. <br />b.CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix. <br />10.Plastic Pressure Piping Gasketed Joints: Join according to ASTM D 3139. <br />E.PAINTING <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.