Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />PAINTING 09 91 00 - 10 <br />3.8 PAINT SCHEDULE <br />A. Exterior Paint Schedule: <br />1. General: Provide the following paint systems for the various substrates indicated. <br />2. All new exterior exposed metals are to be painted which include but are not limited to steel lintels, <br />shelf angles and column and beam steel. <br />3. Ferrous Metal: Primer is not required on shop-primed items. <br />a. Full-Gloss Enamel: Two finish coats over primer. <br />1) Primer: Synthetic rust-inhibiting primer. <br />2) First and Second Coats: Gloss acrylic enamel. <br />4. Zinc-Coated Metal: <br />a. High-Gloss Enamel: Two finish coats over primer. <br />1) Primer: Galvanized metal primer. <br />2) First and Second Coats: Gloss acrylic enamel. <br />B. Interior Paint Schedule: PT-1 <br />1. General: Provide the following paint systems for the various substrates, as indicated. Refer to <br />Division 09 Section “Special Coatings” for epoxy coating systems scheduled. <br />2. Concrete Masonry Units: <br />a. Semigloss Enamel Finish: 2 coats over filled surface with total dry film thickness not less <br />than 3.5 mils, excluding filler coat. <br />1) Block Filler: High-performance latex block filler. <br />2) Undercoat: Interior enamel undercoat. <br />3) Finish Coat: Interior, semigloss enamel. <br />3. Gypsum Drywall Systems: <br />a. Odorless Eggshell Enamel Finish: 3 coats with total dry film thickness not less than 2.5 <br />mils. <br />1) Primer: White, interior, latex-based primer. <br />2) First and Second Coats: Interior, semigloss, odorless enamel. <br />4. Ferrous Metal: <br />a. Semigloss Enamel Finish: 2 coats over primer with total dry film thickness not less than 2.5 <br />mils. <br />1) Primer: Synthetic, quick-drying, rust-inhibiting primer. <br />2) Undercoat: Interior enamel undercoat. <br />3) Finish Coat: Interior, semigloss, odorless, enamel. <br />5. Zinc-Coated Metal: <br />a. Semigloss Finish: 2 coats over primer, with total dry film thickness not less than 2.5 mils. <br />1) Primer: Galvanized metal primer. <br />2) Undercoat: Interior enamel undercoat. <br />3) Finish Coat: Interior, semigloss, odorless, enamel. <br />C. Exposed Structural Ceilings: <br />1. “Dry Fog” method. Prime galvanized decks and paint as follows <br />a. Glidden–“ICI” 5207 primer and use Glidden–“ICI” Alkyd Eggshell 1180. <br />b. SW ProIndustrial Pro-Cryl Acrylic Metal Primer, B66-310 and use Sherwin-Williams <br />Waterborne Acrylic Dry Fall Eg-Shel, B42W2. <br />c. Approved equal all in strict accordance with manufacturer’s installation instructions by <br />BM, MAB, PPG. <br />D. Special Note: General <br />1. Use satin (eggshell) finish in lieu of semigloss in locations approved in the field by the Architect. <br />END OF SECTION 09 91 00 <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.