Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />PROPOSAL FORMS Proposal - 2 <br /> <br />SINGLE PRIME CONTRACT: <br /> <br />BASE BID: <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br />ALTERNATE A-1: Exterior Egress Walkway <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br />ALTERNATE A-2: ADA Parking Signage Replacement <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br />ALTERNATE A-3: Owner Preferred Manufacturer(s) - Door Hardware: <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br />ALTERNATE E-1: Owner Preferred Manufacturer(s) - Electrical: <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br /> <br /> <br />MAJOR SUBCONTRACTORS if any (Name, City & State) <br /> <br />General Subcontractor: Plumbing Subcontractor: <br /> <br /> Lic Lic <br /> <br />Mechanical Subcontractor: Electrical Subcontractor: <br /> <br /> Lic Lic <br /> <br /> <br />GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is <br />accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed <br />subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a <br />contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the contractor. <br /> <br /> <br />ALLOWANCES - (Refer to Division 01 Section 01 21 00 – Allowances for amounts to be included in bid shall <br />be based on the Allowances as provided as part of Section 01 21 00) Acknowledge Allowances have been included <br />with in the Base Bid. <br /> <br /> <br />No. A-1 Contingency _________ <br /> <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.