Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />SHEET CARPETING 09 68 16 - 1 <br />SECTION 09 68 16 - SHEET CARPETING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes the following: <br />1. Carpet - Broadloom <br />B. Related Sections include the following: <br /> <br />1. Division 09 Section "Resilient Base and Accessories" for resilient wall base and accessories <br />installed with carpet. <br />1.3 SUBMITTALS <br />A. Product Data: For the following, including installation recommendations for each type of substrate: <br />1. Carpet: For each type indicated. Include manufacturer's written data on physical characteristics, <br />durability, and fade resistance. <br />2. Carpet Cushion: For each type indicated. Include manufacturer's written data on physical <br />characteristics and durability. <br />B. Shop Drawings: Show the following: <br />1. Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts <br />are required in carpet. <br />2. Existing flooring materials to be removed. <br />3. Existing flooring materials to remain. <br />4. Carpet type, color, and dye lot. <br />5. Locations where dye lot changes occur. <br />6. Seam locations, types, and methods. <br />7. Type of subfloor. <br />8. Type of installation. <br />9. Pattern type, repeat size, location, direction, and starting point. <br />10. Pile direction. <br />11. Type, color, and location of insets and borders. <br />12. Type, color, and location of edge, transition, and other accessory strips. <br />13. Transition details to other flooring materials. <br />14. Type of carpet cushion. <br />C. Samples: For each of the following products and for each color and texture required. Label each Sample <br />with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and <br />in schedules. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.