Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />RESILIENT BASE AND ACCESSORIES 09 65 13 - 1 <br />SECTION 09 65 13 - RESILIENT BASE AND ACCESSORIES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Resilient base and accessories. <br />2. Resilient stair accessories <br />B. Related Sections: <br />1. Division 09 Section "Tile Carpeting" for carpet floor tile. <br />2. Division 09 for additional flooring sections. <br />1.3 SUBMITTALS <br />A. Product Data: For each type of product indicated. <br />B. Samples for Initial Selection: For each type of product indicated. <br />1.4 QUALITY ASSURANCE <br />A. Single-Source Responsibility for Products: Obtain each type and color of product specified from a single <br />source with resources to provide products of consistent quality in appearance and physical properties <br />without delaying progress of the Work. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient <br />temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more <br />than 90 deg F. <br />B. Deliver products to Project site in original manufacturer's unopened cartons and containers, each bearing <br />names of product and manufacturer, Project identification, and shipping and handling instructions. <br />C. Move products into spaces where they will be installed at least 48 hours in advance of installation. <br />1.6 PROJECT CONDITIONS <br />A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F or <br />more than 95 deg F, in spaces to receive resilient products during the following time periods: <br />1. 48 hours before installation. <br />2. During installation. <br />3. 48 hours after installation. <br />B. Until Substantial Completion, maintain ambient temperatures within range recommended by <br />manufacturer, but not less than 55 deg F or more than 95 deg F. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.