Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />GYPSUM BOARD 09 29 00 - 7 <br />F. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more <br />than 1/16 inch of open space between panels. Do not force into place. <br />G. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or <br />gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges <br />or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control <br />joints at corners of framed openings. <br />H. Form control and expansion joints with space between edges of adjoining gypsum panels. <br />I. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), <br />except in chases braced internally. <br />1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, <br />coverage may be accomplished with scraps of not less than 8 sq. ft. in area. <br />2. Fit gypsum panels around ducts, pipes, and conduits. <br />3. Where partitions intersect structural members projecting below underside of floor/roof slabs and <br />decks, cut gypsum panels to fit profile formed by structural members; allow 1/4- to 3/8-inch- wide <br />joints to install sealant. <br />J. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments, except <br />floors. Provide 1/4- to 1/2-inch- wide spaces at these locations, and trim edges with edge trim where <br />edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical <br />sealant. <br />K. Attachment to Steel Framing: Attach panels so leading edge or end of each panel is attached to open <br />(unsupported) edges of stud flanges first. <br />L. Space fasteners in gypsum panels according to referenced gypsum board application and finishing <br />standard and manufacturer's recommendations. <br />1. Space screws a maximum of 12 inches o.c. for vertical applications. <br />3.6 APPLYING INTERIOR GYPSUM BOARD <br />A. Install interior gypsum board in the following locations: <br />1. Regular Type: As indicated on Drawings. <br />2. Type X: Install in Shower Rooms and behind Wet Areas. <br />3. Type C: Where required for specific fire-resistance-rated assembly indicated. <br />B. Single-Layer Application: <br />1. On ceilings, apply gypsum panels before wall/partition board application to greatest extent <br />possible and at right angles to framing, unless otherwise indicated. <br />2. On partitions/walls, apply gypsum panels vertically (parallel to framing), unless otherwise <br />indicated or required by fire-resistance-rated assembly, and minimize end joints. <br />a. Stagger abutting end joints not less than one framing member in alternate courses of <br />panels. <br />3. On Z-furring members, apply gypsum panels vertically (parallel to framing) with no end joints. <br />Locate edge joints over furring members. <br />4. Fastening Methods: Apply gypsum panels to supports with steel drill screws. <br />3.7 GYPSUM SHEATHING INSTALLATION <br />A. General: Install sheathing board according to manufacturer's instructions and GA-253 "Application of <br />Gypsum Sheathing." Cut boards at penetrations, edges, and other obstructions of the work, fit tight <br />against abutting construction, except provide a 3/8" setback where non-load bearing elements abut <br />structural elements. Coordinate sheathing with flashing and joint installation so these materials are <br />installed in sequence and manner that prevent moisture from passing through the completed exterior wall <br />assembly, apply fasteners so screw heads bear tightly against face of sheathing boards but do not cut into <br />facing. Do not bridge building expansion joints with sheathing, cut and space edges to match spacing of <br />structural support elements. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.