Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />GYPSUM BOARD 09 29 00 - 1 <br />SECTION 09 29 00 - GYPSUM BOARD <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes the following: <br />1. Interior gypsum board <br />2. Interior wall and ceiling framing <br />3. Reveal and Trim Moldings <br />B. Related Sections include the following: <br />1. Division 06 Section "Rough Carpentry" for wood framing and furring that supports gypsum board. <br />1.3 SUBMITTALS <br />A. Product Data: For each type of product indicated. <br />1.4 QUALITY ASSURANCE <br />A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and <br />construction identical to those tested in assembly indicated according to ASTM E 119 by an independent <br />testing agency. <br />B. Fire-Test-Response Characteristics: Where fire-resistance-rated gypsum board assemblies are indicated, <br />provide gypsum board assemblies that comply with the following requirements: <br />1. Fire-Resistance Ratings: As indicated by GA File Numbers in GA-600 "Fire Resistance Design <br />Manual" or design designations in UL "Fire Resistance Directory" or in the listing of another <br />testing and inspecting agency acceptable to authorities having jurisdiction. <br />2. Gypsum board assemblies indicated are identical to assemblies tested for fire resistance according <br />to ASTM E 119 by an independent testing and inspecting agency acceptable to authorities having <br />jurisdiction. <br />3. Deflection and Firestop Track: Top runner provided in fire-resistance-rated assemblies indicated <br />is labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable <br />to authorities having jurisdiction. <br />C. Above-Ceiling Observation: Architect will conduct an above-ceiling observation prior to installation of <br />gypsum board ceilings and report any deficiencies in the Work observed. Do not proceed with <br />installation of gypsum board to ceiling support framing until deficiencies have been corrected. <br />1. Notify Architect one week in advance of the date and the time when the Project, or part of the <br />Project, will be ready for an above-ceiling observation. <br />1.5 STORAGE AND HANDLING <br />A. Store materials inside under cover and keep them dry and protected against damage from weather, <br />condensation, direct sunlight, construction traffic, and other causes. Stack panels flat to prevent sagging. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.