Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Southern Expansion Smith Sinnett / 2017027 <br />Phase 1 – Seymour Center Renovation and Addition Orange County <br /> <br />GLAZING 08 80 00 - 8 <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine framing glazing, with Installer present, for compliance with the following: <br />1. Manufacturing and installation tolerances, including those for size, squareness, and offsets at <br />corners. <br />2. Presence and functioning of weep system. <br />3. Minimum required face or edge clearances. <br />4. Effective sealing between joints of glass-framing members. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Clean glazing channels and other framing members receiving glass immediately before glazing. Remove <br />coatings not firmly bonded to substrates. <br />3.3 GLAZING, GENERAL <br />A. Comply with combined written instructions of manufacturers of glass, sealants, gaskets, and other glazing <br />materials, unless more stringent requirements are indicated, including those in referenced glazing <br />publications. <br />B. Glazing channel dimensions, as indicated on Drawings, provide necessary bite on glass, minimum edge <br />and face clearances, and adequate sealant thicknesses, with reasonable tolerances. Adjust as required by <br />Project conditions during installation. <br />C. Protect glass edges from damage during handling and installation. Remove damaged glass from Project <br />site and legally dispose of off Project site. Damaged glass is glass with edge damage or other <br />imperfections that, when installed, could weaken glass and impair performance and appearance. <br />D. Apply primers to joint surfaces where required for adhesion of sealants, as determined by preconstruction <br />sealant-substrate testing. <br />E. Install setting blocks in sill rabbets, sized and located to comply with referenced glazing publications, <br />unless otherwise required by glass manufacturer. Set blocks in thin course of compatible sealant suitable <br />for heel bead. <br />F. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites. <br />G. Provide spacers for glass lites where length plus width is larger than 50 inches as follows: <br />1. Locate spacers directly opposite each other on both inside and outside faces of glass. Install <br />correct size and spacing to preserve required face clearances, unless gaskets and glazing tapes are <br />used that have demonstrated ability to maintain required face clearances and to comply with <br />system performance requirements. <br />a. Provide 1/8-inch minimum bite of spacers on glass and use thickness equal to sealant <br />width. With glazing tape, use thickness slightly less than final compressed thickness of <br />tape. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.