Orange County NC Website
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br /> <br /> 06/16/20 08710 - 5 DOOR HARDWARE <br />C. Existing Openings: Where existing doors, frames and/or hardware are to remain, field verify existing <br />functions, conditions and preparations and coordinate to suit opening conditions and to provide proper <br />door operation. <br />1.08 WARRANTY <br />A. Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components <br />of door hardware that fail in materials or workmanship within specified warranty period. <br />1. Warranty Period: Beginning from date of Substantial Completion, for durations indicated. <br />a. Locksets: <br />1) Mechanical: 3 years. <br />b. Key Blanks: Lifetime <br />2. Warranty does not cover damage or faulty operation due to improper installation, improper use or <br />abuse. <br />1.09 MAINTENANCE <br />A. Maintenance Tools: Furnish complete set of special tools required for maintenance and adjustment of <br />hardware, including changing of cylinders. <br />PART 2 - PRODUCTS <br />2.01 MANUFACTURERS <br />A. Approval of manufacturers and/or products other than those listed as “Scheduled Manufacturer” or <br />“Acceptable Manufacturers” in the individual article for the product category shall be in accordance <br />with QUALITY ASSURANCE article, herein. <br />B. Approval of products from manufacturers indicated in “Acceptable Manufacturers” is contingent upon <br />those products providing all functions and features and meeting all requirements of scheduled <br />manufacturer’s product. <br />C. Where specified hardware is not adaptable to finished shape or size of members requiring hardware, <br />furnish suitable types having same operation and quality as type specified, subject to Architect's <br />approval. <br />2.02 MATERIALS <br />A. Fasteners <br />1. Provide hardware manufactured to conform to published templates, generally prepared for <br />machine screw installation. <br />2. Furnish screws for installation with each hardware item. Finish exposed (exposed under any <br />condition) screws to match hardware finish, or, if exposed in surfaces of other work, to match <br />finish of this other work including prepared for paint surfaces to receive painted finish. <br />3. Provide concealed fasteners for hardware units exposed when door is closed except when no <br />standard units of type specified are available with concealed fasteners. Do not use thru-bolts for <br />installation where bolt head or nut on opposite face is exposed in other work unless thru-bolts are <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE