Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br /> <br /> 06/16/20 08710 - 2 DOOR HARDWARE <br />1.04 SUBMITTALS <br />A. General: <br />1. Submit in accordance with Conditions of Contract and Division 01 requirements. <br />2. Highlight, encircle, or otherwise specifically identify on submittals deviations from Contract <br />Documents, issues of incompatibility or other issues which may detrimentally affect the Work. <br />3. Prior to forwarding submittal, comply with procedures for verifying existing door and frame <br />compatibility for new hardware, as specified in PART 3, “EXAMINATION” article, herein. <br />B. Action Submittals: <br />1. Product Data: Technical product data for each item of door hardware, installation instructions, <br />maintenance of operating parts and finish, and other information necessary to show compliance <br />with requirements. <br />2. Samples for Verification: If requested by Architect, submit production sample of requested door <br />hardware unit in finish indicated, and tagged with full description for coordination with schedule. <br />a. Samples will be returned to supplier. Units that are acceptable to Architect may, after final <br />check of operations, be incorporated into Work, within limitations of key coordination <br />requirements. <br />3. Door Hardware Schedule: Submit schedule with hardware sets in vertical format as illustrated by <br />Sequence of Format for the Hardware Schedule as published by the Door and Hardware Institute. <br />Indicate complete designations of each item required for each door or opening, include: <br />a. Door Index; include door number, heading number, and Architects hardware set number. <br />b. Opening Lock Function Spreadsheet: List locking device and function for each opening. <br />c. Quantity, type, style, function, size, and finish of each hardware item. <br />d. Name and manufacturer of each item. <br />e. Fastenings and other pertinent information. <br />f. Location of each hardware set cross-referenced to indications on Drawings. <br />g. Explanation of all abbreviations, symbols, and codes contained in schedule. <br />h. Mounting locations for hardware. <br />i. Door and frame sizes and materials. <br />j. Name and phone number for local manufacturer's representative for each product. <br />1) Submittal Sequence: Submit door hardware schedule concurrent with submissions of <br />Product Data, Samples, and Shop Drawings. Coordinate submission of door hardware <br />schedule with scheduling requirements of other work to facilitate fabrication of other <br />work that is critical in Project construction schedule. <br />4. Key Schedule: <br />a. After Keying Conference, provide keying schedule listing levels of keying as well as <br />explanation of key system's function, key symbols used and door numbers controlled. <br />b. Use ANSI/BHMA A156.28 “Recommended Practices for Keying Systems” as guideline for <br />nomenclature, definitions, and approach for selecting optimal keying system. <br />c. Provide 3 copies of keying schedule for review prepared and detailed in accordance with <br />referenced DHI publication. Include schematic keying diagram and index each key to unique <br />door designations. <br />d. Index keying schedule by door number, keyset, hardware heading number, cross keying <br />instructions, and special key stamping instructions. <br />e. Provide one complete bitting list of key cuts and one key system schematic illustrating system <br />usage and expansion. <br />1) Forward bitting list, key cuts and key system schematic directly to Owner, by means as <br />directed by Owner. <br />f. Prepare key schedule by or under supervision of supplier, detailing Owner’s final keying <br />instructions for locks. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.