Orange County NC Website
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />FLUSH WOOD DOORS 08 14 16 - 4 <br />2.4 FABRICATION <br />A. Factory fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of <br />referenced quality standard for fitting unless otherwise indicated. <br />1. Comply with requirements in NFPA 80 for fire-rated doors. <br />B. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI- <br />WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, DHI A115-W series <br />standards, and hardware templates. <br />1. Coordinate with hardware mortises in metal frames to verify dimensions and alignment before <br />factory machining. <br />2. Metal Astragals: Factory machine astragals and formed-steel edges for hardware for pairs of fire- <br />rated doors. <br />C. Openings: Cut and trim openings through doors in factory. <br />1. Light Openings: Trim openings with moldings of material and profile indicated. <br />2. Glazing: Factory install glazing in doors indicated to be factory finished. Comply with applicable <br />requirements in Division 08 Section "Glazing." <br />3. Louvers: Factory install louvers in prepared openings. <br />2.5 FACTORY FINISHING <br />A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, including <br />fitting doors for openings and machining for hardware that is not surface applied, before finishing. <br />1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be omitted on <br />bottom edges, edges of cutouts, and mortises. <br />B. Finish doors at factory. <br />C. Transparent Finish: <br />1. Grade: Premium Custom. <br />2. Finish: AWI conversion varnish or catalyzed polyurethane. <br />3. Staining: As selected by Architect from manufacturer's full range. <br />4. Effect: Filled finish. <br />5. Sheen: Semigloss. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine doors and installed door frames before hanging doors. <br />1. Verify that frames comply with indicated requirements for type, size, location, and swing <br />characteristics and have been installed with level heads and plumb jambs. <br />2. Reject doors with defects. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. Hardware: For installation, see Division 08 Section "Door Hardware." <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE