Orange County NC Website
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 2 <br />2. Interruption of utility services. Do not interrupt utility services unless interruption is coordinated <br />with Owner. <br />3. Coordination for shutoff, capping, and continuation of utility services. <br />4. Use of elevator and stairs. <br />5. Locations of proposed dust- and noise-control temporary partitions and means of egress. <br />6. Coordination of Owner's continuing occupancy of existing building and of Owner's partial <br />occupancy of completed Work. <br />7. Means of protection for items to remain and items in path of waste removal from building. <br />B. Inventory: After selective demolition is complete, submit a list of items that have been removed and <br />salvaged. <br />C. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements, <br />including finish surfaces, that might be misconstrued as damage caused by selective demolition <br />operations. Submit before Work begins. <br />D. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to <br />accept hazardous wastes. <br />1.6 QUALITY ASSURANCE <br />A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning <br />selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. <br />B. Standards: Comply with ANSI A10.6 and NFPA 241. <br />C. Predemolition Conference: Conduct conference at Project site to comply with requirements in <br />Division 01 Section "Project Management and Coordination." Review methods and procedures related to <br />selective demolition including, but not limited to, the following: <br />1. Inspect and discuss condition of construction to be selectively demolished. <br />2. Review and finalize selective demolition schedule and verify availability of materials, demolition <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />3. Review requirements of work performed by other trades that rely on substrates exposed by <br />selective demolition operations. <br />4. Review areas where existing construction is to remain and requires protection. <br />1.7 PROJECT CONDITIONS <br />A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct <br />selective demolition so Owner's operations will not be disrupted. <br />1. Comply with requirements specified in Division 01 Section "Summary." <br />B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as <br />practical. <br />C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with <br />selective demolition. <br />D. Storage or sale of removed items or materials on-site is not permitted. <br />E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage <br />during selective demolition operations. <br />1. Maintain fire-protection facilities in service during selective demolition operations. <br />1.8 WARRANTY <br />A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during <br />selective demolition, by methods and with materials so as not to void existing warranties. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE