Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />DEMONSTRATION AND TRAINING 01 79 00 - 4 <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Assemble educational materials necessary for instruction, including documentation and training module. <br />Assemble training modules into a combined training manual. <br />B. Set up instructional equipment at instruction location. <br />3.2 INSTRUCTION <br />A. Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to <br />coordinate instructors, and to coordinate between Contractor and Owner for number of participants, <br />instruction times, and location. <br />B. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, <br />subsystems, and equipment not part of a system. <br />1. Architect will furnish an instructor to describe basis of system design, operational requirements, <br />criteria, and regulatory requirements. <br />2. Owner will furnish an instructor to describe Owner's operational philosophy. <br />3. Owner will furnish Contractor with names and positions of participants. <br />C. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal <br />operation, provide similar instruction at start of each season. <br />1. Schedule training with Owner, through Architect, with at least seven days' advance notice. <br />D. Evaluation: At conclusion of each training module, assess and document each participant's mastery of <br />module by use of a demonstration performance-based test. <br />E. Cleanup: Collect used and leftover educational materials and. Remove instructional equipment. Restore <br />systems and equipment to condition existing before initial training use. <br />3.3 DEMONSTRATION AND TRAINING VIDEO <br />A. General: Engage a qualified commercial photographer to record demonstration and training video. <br />Record each training module separately. Include classroom instructions and demonstrations, board <br />diagrams, and other visual aids, but not student practice. <br />1. At beginning of each training module, record each chart containing learning objective and lesson <br />outline. <br />B. Video Format: Provide high-quality DVD video format capable of running on any typical computer <br />system. <br />C. Recording: Mount camera on tripod before starting recording, unless otherwise necessary to show area of <br />demonstration and training. Display continuous running time. <br />D. Narration: Describe scenes by audio narration by microphone. Include description of items being <br />viewed. Describe vantage point, indicating location, direction (by compass point), and elevation or story <br />of construction. <br />END OF SECTION 01 79 00 <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.