Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />DEMONSTRATION AND TRAINING 01 79 00 - 1 <br />SECTION 01 79 00 - DEMONSTRATION AND TRAINING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes administrative and procedural requirements for instructing Owner's personnel, <br />including the following: <br />1. Demonstration of operation of systems, subsystems, and equipment. <br />2. Training in operation and maintenance of systems, subsystems, and equipment. <br />3. Demonstration and training video. <br />B. Related Sections include the following: <br />1. Division 01 Section "Project Management and Coordination" for requirements for pre-instruction <br />conferences. <br />2. Divisions 02 through 49 Sections for specific requirements for demonstration and training for <br />products in those Sections. <br />1.3 SUBMITTALS <br />A. Instruction Program: Submit two copies of outline of instructional program for demonstration and <br />training, including a schedule of proposed dates, times, length of instruction time, and instructors' names <br />for each training module. Include learning objective and outline for each training module. <br />1. At completion of training, submit one complete training manual(s) for Owner's use. <br />B. Demonstration and Training Video: Submit two copies within seven days of end of each training <br />module. <br />1. Identification: On each copy, provide an applied label with the following information: <br />a. Name of Project. <br />b. Name and address of photographer. <br />c. Name of Architect. <br />d. Name of Contractor. <br />e. Date was recorded. <br />f. Description of vantage point, indicating location, direction (by compass point), and <br />elevation or story of construction. <br />C. Transcript: Prepared on 8-1/2-by-11-inch paper, punched and bound in heavy-duty, 3-ring, vinyl-covered <br />binders. Mark appropriate identification on front and spine of each binder. Include a cover sheet with <br />same label information as the corresponding video. Include name of Project and date of video on each <br />page. <br />1.4 QUALITY ASSURANCE <br />A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance <br />personnel in a training program similar in content and extent to that indicated for this Project, and whose <br />work has resulted in training or education with a record of successful learning performance. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.