Orange County NC Website
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />PRODUCT REQUIREMENTS 01 60 00 - 4 <br />C. Storage: <br />1. Store products to allow for inspection and measurement of quantity or counting of units. <br />2. Store materials in a manner that will not endanger Project structure. <br />3. Store products that are subject to damage by the elements, under cover in a weathertight enclosure <br />above ground, with ventilation adequate to prevent condensation. <br />4. Store cementitious products and materials on elevated platforms. <br />5. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation <br />and concealment. <br />6. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, <br />and weather-protection requirements for storage. <br />7. Protect stored products from damage and liquids from freezing. <br />8. Provide a secure location and enclosure at Project site for storage of materials and equipment by <br />Owner's construction forces. Coordinate location with Owner. <br />1.7 PRODUCT WARRANTIES <br />A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties <br />required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties <br />do not relieve Contractor of obligations under requirements of the Contract Documents. <br />1. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a <br />particular product and specifically endorsed by manufacturer to Owner. <br />Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to <br />extend time limit provided by manufacturer's warranty or to provide more rights for Owner. <br />B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready <br />for execution. Submit a draft for approval before final execution. <br />1. Manufacturer's Standard Form: Modified to include Project-specific information and properly <br />executed. <br />2. Specified Form: When specified forms are included with the Specifications, prepare a written <br />document using appropriate form properly executed. <br />3. Refer to Divisions 02 through 49 Sections for specific content requirements and particular <br />requirements for submitting special warranties. <br />C. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures." <br />PART 2 - PRODUCTS <br />2.1 PRODUCT SELECTION PROCEDURES <br />A. General Product Requirements: Provide products that comply with the Contract Documents, that are <br />undamaged and, unless otherwise indicated, that are new at time of installation. <br />1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a <br />complete installation and indicated use and effect. <br />2. Standard Products: If available, and unless custom products or nonstandard options are specified, <br />provide standard products of types that have been produced and used successfully in similar <br />situations on other projects. <br />3. Owner reserves the right to limit selection to products with warranties not in conflict with <br />requirements of the Contract Documents. <br />4. Where products are accompanied by the term "as selected," Architect will make selection. <br />5. Where products are accompanied by the term "match sample," sample to be matched is <br />Architect's. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE