Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />PRODUCT REQUIREMENTS 01 60 00 - 3 <br />i. Cost information, including a proposal of change, if any, in the Contract Sum. <br />j. Contractor's certification that proposed substitution complies with requirements in the <br />Contract Documents and is appropriate for applications indicated. <br />k. Contractor's waiver of rights to additional payment or time that may subsequently become <br />necessary because of failure of proposed substitution to produce indicated results. <br />3. Architect's Action: If necessary, Architect will request additional information or documentation <br />for evaluation within 7 days of receipt of a request for substitution. Architect will notify <br />Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, <br />or 7 days of receipt of additional information or documentation, whichever is later. <br />a. Form of Acceptance: Change Order. <br />b. Use product specified if Architect cannot make a decision on use of a proposed substitution <br />within time allocated. <br />F. Comparable Product Requests: Submit three copies of each request for consideration. Identify product <br />or fabrication or installation method to be replaced. Include Specification Section number and title and <br />Drawing numbers and titles. <br />1. Architect's Action: If necessary, Architect will request additional information or documentation <br />for evaluation within one week of receipt of a comparable product request. Architect will notify <br />Contractor of approval or rejection of proposed comparable product request within 15 days of <br />receipt of request, or 7 days of receipt of additional information or documentation, whichever is <br />later. <br />a. Form of Approval: As specified in Division 01 Section "Submittal Procedures." <br />Use product specified if Architect cannot make a decision on use of a comparable product request <br />within time allocated. <br />G. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 01 Section <br />"Submittal Procedures." Show compliance with requirements. <br />1.5 QUALITY ASSURANCE <br />A. Compatibility of Options: If Contractor is given option of selecting between two or more products for <br />use on Project, product selected shall be compatible with products previously selected, even if previously <br />selected products were also options. <br />1. Each contractor is responsible for providing products and construction methods compatible with <br />products and construction methods of other contractors. <br />2. If a dispute arises between contractors over concurrently selectable but incompatible products, <br />Architect will determine which products shall be used. <br />1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and <br />loss, including theft. Comply with manufacturer's written instructions. <br />B. Delivery and Handling: <br />1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of <br />construction spaces. <br />2. Coordinate delivery with installation time to ensure minimum holding time for items that are <br />flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. <br />3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed <br />container or other packaging system, complete with labels and instructions for handling, storing, <br />unpacking, protecting, and installing. <br />4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that <br />products are undamaged and properly protected. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.