Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />PRODUCT REQUIREMENTS 01 60 00 - 2 <br />1.4 SUBMITTALS <br />A. Product List: Submit a list, in tabular from, showing specified products. Include generic names of <br />products required. Include manufacturer's name and proprietary product names for each product. <br />1. Coordinate product list with Contractor's Construction Schedule and the Submittals Schedule. <br />2. Form: Tabulate information for each product under the following column headings: <br />a. Specification Section number and title. <br />b. Generic name used in the Contract Documents. <br />c. Proprietary name, model number, and similar designations. <br />d. Manufacturer's name and address. <br />e. Supplier's name and address. <br />f. Installer's name and address. <br />g. Projected delivery date or time span of delivery period. <br />h. Identification of items that require early submittal approval for scheduled delivery date. <br />B. Initial Submittal: Within 30 days after date of commencement of the Work, submit 3 copies of initial <br />product list. Include a written explanation for omissions of data and for variations from Contract <br />requirements. <br />1. At Contractor's option, initial submittal may be limited to product selections and designations that <br />must be established early in Contract period. <br />C. Completed List: Within 60 days after date of commencement of the Work, submit 3 copies of completed <br />product list. Include a written explanation for omissions of data and for variations from Contract <br />requirements. <br />D. Architect's Action: Architect will respond in writing to Contractor within 15 days of receipt of completed <br />product list. Architect's response will include a list of unacceptable product selections and a brief <br />explanation of reasons for this action. Architect's response, or lack of response, does not constitute a <br />waiver of requirement to comply with the Contract Documents. <br />E. Substitution Requests: The Architect will consider requests for substitution if received within 10 <br />consecutive calendar days prior to bid. Requests received more than 10 consecutive calendar days prior to <br />bid will be rejected at the discretion of the Architect. Submit three copies of each request for <br />consideration. Identify product or fabrication or installation method to be replaced. Include Specification <br />Section number and title and Drawing numbers and titles. <br />1. Substitution Request Form: <br />2. Documentation: Show compliance with requirements for substitutions and the following, as <br />applicable: <br />a. Statement indicating why specified material or product cannot be provided. <br />b. Coordination information, including a list of changes or modifications needed to other parts <br />of the Work and to construction performed by Owner and separate contractors that will be <br />necessary to accommodate proposed substitution. <br />c. Product Data, including drawings and descriptions of products and fabrication and <br />installation procedures. <br />d. Samples, where applicable or requested. <br />e. List of similar installations for completed projects with project names and addresses and <br />names and addresses of architects and owners. <br />f. Material test reports from a qualified testing agency indicating and interpreting test results <br />for compliance with requirements indicated. <br />g. Research/evaluation reports evidencing compliance with building code in effect for Project, <br />from a model code organization acceptable to authorities having jurisdiction. <br />h. Detailed comparison of Contractor's Construction Schedule using proposed substitution <br />with products specified for the Work, including effect on the overall Contract Time. If <br />specified product or method of construction cannot be provided within the Contract Time, <br />include letter from manufacturer, on manufacturer's letterhead, stating lack of availability <br />or delays in delivery. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.