Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />SUBMITTAL PROCEDURES 01 33 00 - 8 <br />6. Statement whether conditions, products, and installation will affect warranty. <br />7. Other required items indicated in individual Specification Sections. <br />U. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or <br />bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of <br />deductibles, if any, and term of the coverage. <br />V. Construction Comply with requirements specified in Division 01 Section "Photographic Documentation." <br />W. Material Safety Data Sheets (MSDSs): Submit information directly to Owner; do not submit to Architect. <br />1. Architect will not review submittals that include MSDSs and will return the entire submittal for <br />resubmittal. <br />2.3 DELEGATED DESIGN <br />A. Performance and Design Criteria: Where professional design services or certifications by a design <br />professional are specifically required of Contractor by the Contract Documents, provide products and <br />systems complying with specific performance and design criteria indicated. <br />1. If criteria indicated are not sufficient to perform services or certification required, submit a written <br />request for additional information to Architect. <br />B. Delegated-Design Submittal: In addition to Shop Drawings, Product Data, and other required submittals, <br />submit three copies of a statement, signed and sealed by the responsible design professional, for each <br />product and system specifically assigned to Contractor to be designed or certified by a design <br />professional. <br />1. Indicate that products and systems comply with performance and design criteria in the Contract <br />Documents. Include list of codes, loads, and other factors used in performing these services. <br />PART 3 - EXECUTION <br />3.1 CONTRACTOR'S REVIEW <br />A. Review each submittal and check for coordination with other Work of the Contract and for compliance <br />with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before <br />submitting to Architect. <br />B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and <br />location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's <br />approval, and statement certifying that submittal has been reviewed, checked, and approved for <br />compliance with the Contract Documents. <br />3.2 ARCHITECT'S / ACTION <br />A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return <br />them without action. <br />B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or <br />modifications required, and return it. Architect will stamp each submittal with an action stamp and will <br />mark stamp appropriately to indicate action taken. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.