Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />SUBMITTAL PROCEDURES 01 33 00 - 7 <br />L. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to <br />authorities having jurisdiction, that product complies with building code in effect for Project. Include the <br />following information: <br />1. Name of evaluation organization. <br />2. Date of evaluation. <br />3. Time period when report is in effect. <br />4. Product and manufacturers' names. <br />5. Description of product. <br />6. Test procedures and results. <br />7. Limitations of use. <br />M. Schedule of Tests and Inspections: Comply with requirements specified in Division 01 Section "Quality <br />Requirements." <br />N. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's <br />standard form, indicating and interpreting results of tests performed before installation of product, for <br />compliance with performance requirements in the Contract Documents. <br />O. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's <br />standard form, indicating and interpreting results of compatibility tests performed before installation of <br />product. Include written recommendations for primers and substrate preparation needed for adhesion. <br />P. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard <br />form, indicating and interpreting results of field tests performed either during installation of product or <br />after product is installed in its final location, for compliance with requirements in the Contract <br />Documents. <br />Q. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal <br />maintenance of products and equipment. Comply with requirements specified in Division 01 Section <br />"Operation and Maintenance Data." <br />R. Design Data: Prepare written and graphic information, including, but not limited to, performance and <br />design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and <br />other performance and design criteria and a summary of loads. Include load diagrams if applicable. <br />Provide name and version of software, if any, used for calculations. Include page numbers. <br />S. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's <br />recommendations, guidelines, and procedures for installing or operating a product or equipment. Include <br />name of product and name, address, and telephone number of manufacturers. Include the following, as <br />applicable: <br />1. Preparation of substrates. <br />2. Required substrate tolerances. <br />3. Sequence of installation or erection. <br />4. Required installation tolerances. <br />5. Required adjustments. <br />6. Recommendations for cleaning and protection. <br />T. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service <br />representative's tests and inspections. Include the following, as applicable: <br />1. Name, address, and telephone number of factory-authorized service representative making report. <br />2. Statement on condition of substrates and their acceptability for installation of product. <br />3. Statement that products at Project site comply with requirements. <br />4. Summary of installation procedures being followed, whether they comply with requirements and, <br />if not, what corrective action was taken. <br />5. Results of operational and other tests and a statement of whether observed performance complies <br />with requirements. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.