Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 7 <br />b. Schedule Updating: Revise Construction Schedule after each coordination meeting where <br />revisions to the schedule have been made or recognized. Issue revised schedule <br />concurrently with report of each meeting. <br />c. Review present and future needs of each contractor present, including the following: <br />1) Interface requirements. <br />2) Sequence of operations. <br />3) Status of submittals. <br />4) Deliveries. <br />5) Off-site fabrication. <br />6) Access. <br />7) Site utilization. <br />8) Temporary facilities and controls. <br />9) Work hours. <br />10) Hazards and risks. <br />11) Progress cleaning. <br />12) Quality and work standards. <br />13) Change Orders. <br />d. Reporting: Contractor shall Record meeting results and distribute copies to everyone in <br />attendance and to others affected by decisions or actions resulting from each meeting. <br />1.8 REQUESTS FOR INTERPRETATION (RFIs) <br />A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not <br />possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified. <br />1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be <br />returned with no response. <br />2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or <br />work of subcontractors. <br />B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the <br />following: <br />1. Project name. <br />2. Date. <br />3. Name of Contractor. <br />4. Name of Architect. <br />5. RFI number, numbered sequentially. <br />6. Specification Section number and title and related paragraphs, as appropriate. <br />7. Drawing number and detail references, as appropriate. <br />8. Field dimensions and conditions, as appropriate. <br />9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the <br />Contract Sum, Contractor shall state impact in the RFI. <br />10. Contractor's signature. <br />11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop <br />Drawings, and other information necessary to fully describe items needing interpretation. <br />a. Supplementary drawings prepared by Contractor shall include dimensions, thicknesses, <br />structural grid references, and details of affected materials, assemblies, and attachments. <br />C. Hard-Copy RFIs: <br />1. Identify each page of attachments with the RFI number and sequential page number. <br />D. Software-Generated RFIs: Software-generated form with substantially the same content as indicated <br />above. <br />1. Attachments shall be electronic files in PDF format. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.