Browse
Search
2020-598-E AMS-Muter Construction Europa upfit SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-598-E AMS-Muter Construction Europa upfit SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 1:20:38 PM
Creation date
8/30/2021 1:11:58 PM
Metadata
Fields
Template:
BOCC
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />ALTERNATES 01 23 00 - 1 <br />SECTION 01 23 00 - ALTERNATES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes administrative and procedural requirements for alternates. <br />1.3 DEFINITIONS <br />A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the <br />Bidding Requirements that may be added to the Base Bid amount if Owner decides to accept a <br />corresponding change either in the amount of construction to be completed or in the products, materials, <br />equipment, systems, or installation methods described in the Contract Documents. <br />1. The cost or credit for each alternate is the net addition to the Contract Sum to incorporate alternate <br />into the Work. No other adjustments are made to the Contract Sum. <br />1.4 PROCEDURES <br />A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the <br />alternate into Project. <br />B. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to <br />or required for a complete installation whether or not indicated as part of alternate. <br />C. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the <br />status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later <br />consideration. Include a complete description of negotiated modifications to alternates. <br />D. Execute accepted alternates under the same conditions as other work of the Contract. <br />E. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections <br />referenced in schedule contain requirements for materials necessary to achieve the work described under <br />each alternate. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 SCHEDULE OF ALTERNATES <br />A. Alternate No. 1; Exterior Egress Walkway: State the amount to be added to the Base Bid for providing <br />all labor and materials to construct the Exterior Egress Walkway as shown and noted in the Contract <br />Drawings per the plans and specifications. <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE
The URL can be used to link to this page
Your browser does not support the video tag.