DSS Skills Development Center Smith Sinnett / 2020045 <br />Chapel Hill, North Carolina Orange County <br /> <br />SUPPLEMENTARY GENERAL CONDITIONS 00 73 00 - 1 <br />SECTION 00 73 00 - SUPPLEMENTARY GENERAL CONDITIONS <br /> <br />The following supplements modify, change, delete from or add to the "General Conditions". Where any article of <br />the General Conditions is modified or any paragraph, subparagraph or clause thereof is modified or deleted by these <br />Supplementary Conditions, the unaltered provisions of that article, paragraph, subparagraph or clause shall remain in <br />effect. <br /> <br />ARTICLE 6 OTHER RECORD DOCUMENTS AND SUBMITTALS <br /> <br /> Paragraph 6.2. Submittals <br /> <br /> Add the following subparagraphs 6.2.1 <br /> <br /> 6.2.1 No submittal involving the selection of a color will be released until all colors are selected and <br />approved by the Owner. <br /> <br />ARTICLE 8 OWNER <br /> <br /> Add Paragraph 8.6 <br /> <br />8.6 Construction Documents are provided as electronic files. The Contractor is responsible for printing hard <br />copies of the Drawings and Project Manuals in the quantities necessary for construction. <br /> <br /> <br />ARTICLE 13 CONTRACT TIME <br /> <br /> Paragraph 13.1: <br /> <br /> Add the following Clauses 13.1.1: <br /> <br />31.1.1 The Contract time shall commence on a date to be specified in a written Notice to Proceed from the <br />Architect. Substantial Completion shall be ninety (90) calendar days from Notice to Proceed. <br />Final Completion shall occur on or before Thirty (30) calendar days from Substantial Completion. <br /> <br /> Paragraph 13.18 Liquidated Damages: <br /> <br /> Add the following Paragraph 13.18.1 and 13.18.2 <br /> <br /> 13.18.1 The Contractor and the Contractor's surety’s shall be liable for and shall pay the Owner the sum of <br />Two Hundred Fifty Dollars ($250.00), herein stipulated as liquidated damages, for each calendar day of delay <br />until the Work is substantially complete. <br /> <br /> Paragraph 13.18.2 Final Completion: <br /> <br /> Add the following Paragraph <br /> <br /> 13.18.2 Time for Completion of final inspection items after Substantial Completion shall be thirty <br /> (30) Days after final inspection list is received by the Contractor. After thirty (30) days, <br /> upon seven (7) days written notice, the Owner shall have the option to correct or conclude any <br /> and all final inspection items not completed by the Contractor to the satisfaction of the <br /> Architect and the Owner within thirty (30) days from the actual date of substantial <br /> completion by utilizing its own forces or hiring others. The cost of correcting such remaining <br /> final inspection items by the Owner or others shall be deducted from the final payment to the <br /> Contractor. <br /> <br />DocuSign Envelope ID: ECCAC5A0-6CC8-4B37-8AD3-89D69F0AE1AE