Browse
Search
2020-552-E AMS-HH Architecture Whiited upfit change order 6
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-552-E AMS-HH Architecture Whiited upfit change order 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 12:55:56 PM
Creation date
8/30/2021 12:55:48 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br /> <br />Schedule <br /> <br />We understand this work needs to secure permitting approval as soon as possible to maintain the <br />overall construction schedule. We propose the following duration to expedite the process: <br /> <br />Construction Documents 2 weeks <br />Permit Review/Contractor Pricing 2 weeks * <br /> <br /> *Beyond HH Architecture Control <br /> <br /> <br />Fee <br /> <br />For the scope detailed above, we propose an additional lump sum fee of Eight Thousand Seven <br />Hundred and Fifty Dollars ($8,750). <br /> <br /> <br />Exclusions <br /> <br />Excluded Services, to be billed as Additional Services only if required: <br /> <br />1. This scope does not include structural analysis or reinforcing design for areas outside of <br />the Level 2 - Alterations in the current permit drawings for the upfit. These include Suites <br />211, 220/230, 250, and Corridor 200H. All other areas are beyond this scope. The Design <br />Team recommends the County commission further study of the Suite 210 area to assess <br />compliance from the previous upfit. <br />2. Any significant redesign to the existing primary building structure. Fee assumes <br />reinforcing only. <br />3. It is anticipated that limited demolition drawings, if any, are required for structural <br />reinforcing design and construction documents. Demolition drawings for the basement <br />area are therefore limited to general architectural plans, as needed. Any further, <br />extensive demolition drawings are beyond this scope. <br />4. Any additional design for plumbing, mechanical, electrical, fire alarm, and fire protection <br />sprinklers are beyond this scope. For the purposes of this proposal, it is assumed all <br />work to access existing structure around building systems will be reinstalled in place, and <br />additional drawings are not required. <br /> <br /> <br />Please let me know if you need additional information. We are excited to continue our work for <br />the County on this project. <br /> <br /> Kristen M. Hess, AIA, LEED AP <br />Principal <br />DocuSign Envelope ID: 8F87A0BE-1C54-4748-B7E6-A0F7CAA7E363
The URL can be used to link to this page
Your browser does not support the video tag.