Browse
Search
2020-548-E AMS-HH Architecture White upfit change order 5
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-548-E AMS-HH Architecture White upfit change order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 12:54:24 PM
Creation date
8/30/2021 12:54:15 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />Consultants <br /> <br />For Structural Engineering, we propose: <br /> Lynch Mykins Structural Engineers, PC <br /> Contact: Collette Ramirez, PE <br /> 301 N. West Street, Suite 105 <br /> Raleigh, NC 27603 <br /> Phone: (919) 782-1833 <br /> <br /> <br />Fee <br /> <br />For the scope detailed above, we propose an additional lump sum fee of Two Thousand Three Hundred <br />Dollars ($2,300). <br /> <br /> <br /> <br />Exclusions <br /> <br />Excluded Services, to be billed as Additional Services only if required: <br /> <br />1. This scope does not include the design of the retrofit if reinforcing is required; this can be <br />provided in a future contract if desired. <br /> <br /> <br />Please let me know if you need additional information. We are excited to continue our work for the <br />County on this project. <br /> <br /> <br />Kristen M. Hess, AIA, LEED AP <br />Principal <br />DocuSign Envelope ID: 3DC0AE71-E354-450D-A59D-E0381668C87F
The URL can be used to link to this page
Your browser does not support the video tag.