Orange County NC Website
Robert Williams – PTO for C&D Phase 2 & 3 <br />August 11, 2020 <br />Page 2 of 7 <br />P:\R00\500\R00592\R00592-226N\PROPOSAL-CONTACT\PRO Williams- C&D Ph 2&3 PTC - CTC Jr.docx <br /> <br /> <br /> Facility Plan to update information regarding waste stream, remaining capacity, and <br />other pertinent data; <br /> Engineering Plan including facility standards, design calculations and technical <br />specifications; <br /> Construction Quality Assurance Plan; <br /> Operations Report including waste screening plan, inspection forms, and monitoring <br />plan; <br /> Closure and Post-Closure Plan: <br /> <br />DAA will meet in person or teleconference with NCDEQ to address any review comments <br />that may be received. <br /> <br />2.2 Design/Construction Drawings: DAA will develop a set of permit drawings per the <br />original permit and update to permit drawings to indicate current operational areas and <br />to reflect proposed grading for the construction of Phase 2 and 3. It is assumed the <br />drawings will include the following sheets: <br /> Cover sheet <br /> Existing conditions <br /> Overall Facility Plan <br /> Phase 2 Base Grades <br /> Phase 3 Base Grades <br /> Phase 3 Final Grades <br /> Details <br /> <br />2.3 Design Hydrogeologic Memorandum: DAA will generate a design hydrogeologic <br />memorandum to be attached to the Permit to Construct application. The memorandum <br />will use previous existing field studies and data collected since 1999 for the various permit <br />applications, groundwater monitoring plans, and hydrogeologic studies conducted by <br />DAA and other consultants. No additional filed studies, groundwater readings, borings, <br />or lab testing are to be completed. <br /> <br />2.4 Project Bid Manual and Contract Documents: DAA will prepare a project manual, <br />contract documents, final construction drawings, and technical specifications to be <br />advertised by the County for bids. DAA will finalize the construction drawing set (100% <br />design) by incorporating comments from previous reviews. DAA will incorporate the <br />project special provisions, bid tabulation, and the front-end and standard technical <br />specifications, and will prepare the final bid package project manual. The County will be <br />responsible for cost of advertising and bidding the project. DAA will assist the County in <br />DocuSign Envelope ID: D2193F1C-ECD7-4E1F-86D9-499117BF12A2