Browse
Search
2020-522-E AMS-HH Architects Change Order Whitted upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-522-E AMS-HH Architects Change Order Whitted upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 9:10:14 AM
Creation date
8/30/2021 9:10:11 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />Consultants <br /> <br />For Mechanical, Plumbing, Electrical and Fire Protection Engineering, we propose: <br />EnTech Engineering, PA <br />Contact: Rod Brown, PE <br />1071 N Berkley Blvd <br />Goldsboro, NC 27534 <br />Phone: (919) 778-9064 <br /> <br /> <br />Fee <br /> <br />For the scope detailed above, we propose an additional lump sum fee of Two Thousand Nine <br />Hundred Dollars ($2,900). <br /> <br /> <br /> <br />Exclusions <br /> <br />Excluded Services, to be billed as Additional Services only if required: <br /> <br />1. General: <br />o Additional Bidding services for the separate 405 Meadowlands facility. <br />o Change in the bidding process or Contractor project delivery method. <br />o Additional meetings with the Owner beyond the number included above (if requested) <br /> <br /> <br />Please let me know if you need additional information. We are excited to continue our work for <br />the County on this project. <br /> <br /> Kristen M. Hess, AIA, LEED AP <br />Principal <br />DocuSign Envelope ID: 7E5090B5-1469-4472-A427-AF4D95292240
The URL can be used to link to this page
Your browser does not support the video tag.